X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241405002

Well Details

Well ID: 0394241405002
Loading map...
Location: 00/05-14-039-24W4/2
Location Alias: 00/05-14-39-24 W4M
Location Alias 2: 00/05-14-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 14
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-14-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0133129
License Date: 1988-03-15
License Status: Suspension
Spud Date: 1988-03-26
Final Drill Date: 1988-04-09
Well Total Depth: 1943.00 m
Surface Hole Latitude: 52.353637
Surface Hole Longitude: -113.359002

For data sources see[1][2]

Well History

Date Event
1988-03-15 Obtained License
1988-03-28 Surface Casing Operation Performed
1988-04-09 Finished Drilling
1988-04-09 Well Mode changed to Drilled and Cased
1988-04-10 Well Log Performed
1988-04-11 Production Casing Operation Performed
1988-04-11 Rig Released
1988-04-15 Well Log Performed
1988-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-17 Perforation Treatment Performed - Jet Perforation
1988-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-18 Perforation Treatment Performed - Jet Perforation
1988-04-19 Perforation Treatment Performed - Acid Wash - No Pressure
1988-05-19 Well Began Production
1988-05-19 Well Fluid changed to Crude Oil
1988-05-19 Well Mode changed to Pumping
1991-03-07 Perforation Treatment Performed - Cement Squeeze
1991-03-08 Perforation Treatment Performed - Cement Squeeze
1991-03-14 Perforation Treatment Performed - Jet Perforation
1991-03-16 Perforation Treatment Performed - Cement Squeeze
1991-03-19 Well Log Performed
1991-03-20 Perforation Treatment Performed - Jet Perforation
1991-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-22 Perforation Treatment Performed - Jet Perforation
1991-03-22 Well Log Performed
1991-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-02 Well Log Performed
1995-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-04 Perforation Treatment Performed - Cement Squeeze
1995-03-04 Plug Back Performed
1995-03-08 Well Log Performed
1995-03-09 Perforation Treatment Performed - Jet Perforation
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
1996-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-17 Perforation 1913.00 1915.00 13
1991-03-20 Perforation 1907.40 1908.40 16
1991-03-21 Acid Treatment 1907.40 1908.40 0
1991-03-22 Perforation 1877.50 1878.50 16
1991-03-23 Acid Treatment 1877.50 1878.50 0
1995-03-04 Acid Treatment 1907.40 1908.40 0
1995-03-04 Cement Squeeze 1907.40 1908.40 0
1995-03-04 Cement Squeeze 1877.50 1878.50 0
1995-03-09 Perforation 1898.00 1900.00 13
1995-03-09 Perforation 1901.00 1902.50 13
1996-12-18 Acid Treatment 1898.00 1902.50 0
1988-04-17 Acid Wash 1913.00 1915.00 0
1988-04-18 Acid Treatment 1913.00 1915.00 0
1988-04-18 Perforation 1878.00 1880.00 14
1988-04-19 Acid Wash 1878.00 1880.00 0
1991-03-07 Cement Squeeze 1913.00 1915.00 0
1991-03-08 Cement Squeeze 1878.00 1880.00 0
1991-03-14 Perforation 1907.50 1910.50 18
1991-03-16 Cement Squeeze 1907.50 1910.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4878 0.0 0.0 0.0
1989 7474 0.0 0.0 0.0
1990 8450 0.0 0.0 0.0
1991 6471 0.0 0.0 0.0
1992 4032 0.0 0.0 0.0

For data sources see[5]

References