If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394232909002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.385273,"lon":-113.273163,"icon":""}]} |
Location: 00/09-29-039-23W4/2 | |
Location Alias: 00/09-29-39-23 W4M | |
Location Alias 2: 00/09-29-039-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 23 | |
Section: 29 | |
County/Municipality: Lacombe County | |
Well Name: EMBER NEVIS 9-29-39-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0276164 | |
License Date: 2002-11-19 | |
License Status: Issued | |
Spud Date: 2002-11-23 | |
Final Drill Date: 2002-11-25 | |
Well Total Depth: 836.00 m | |
Surface Hole Latitude: 52.385273 | |
Surface Hole Longitude: -113.273163 |
Date | Event |
---|---|
2002-11-19 | Obtained License |
2002-11-24 | Surface Casing Operation Performed |
2002-11-25 | Finished Drilling |
2002-11-25 | Well Log Performed |
2002-11-25 | Well Mode changed to Drilled and Cased |
2002-11-26 | Production Casing Operation Performed |
2002-11-26 | Rig Released |
2002-11-28 | Perforation Treatment Performed - Jet Perforation |
2002-11-28 | Well Log Performed |
2002-12-02 | Perforation Treatment Performed - Fractured |
2002-12-03 | Perforation Treatment Performed - Fractured |
2003-01-21 | Well Began Production |
2003-01-21 | Well Fluid changed to Gas |
2003-01-21 | Well Mode changed to Flowing |
2004-05-03 | Perforation Treatment Performed - Jet Perforation |
2004-05-03 | Well Log Performed |
2004-05-08 | Perforation Treatment Performed - Fractured |
2004-05-10 | Well Structure changed to Commingled |
2017-04-05 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-11-28 | Perforation | 774.50 | 776.50 | 17 |
2004-05-03 | Perforation | 709.00 | 711.00 | 13 |
2004-05-03 | Perforation | 244.00 | 244.50 | 13 |
2004-05-03 | Perforation | 247.00 | 247.50 | 13 |
2004-05-03 | Perforation | 248.60 | 249.20 | 13 |
2004-05-03 | Perforation | 253.50 | 254.10 | 13 |
2004-05-03 | Perforation | 277.70 | 278.50 | 13 |
2004-05-03 | Perforation | 298.20 | 298.80 | 13 |
2004-05-03 | Perforation | 339.50 | 340.10 | 13 |
2004-05-03 | Perforation | 346.80 | 348.70 | 13 |
2004-05-03 | Perforation | 349.80 | 352.60 | 13 |
2002-11-28 | Perforation | 579.50 | 580.50 | 17 |
2004-05-03 | Perforation | 356.50 | 357.00 | 13 |
2004-05-03 | Perforation | 364.00 | 364.90 | 13 |
2004-05-03 | Perforation | 369.50 | 370.00 | 13 |
2004-05-03 | Perforation | 383.30 | 383.80 | 13 |
2004-05-03 | Perforation | 386.00 | 386.50 | 13 |
2004-05-03 | Perforation | 387.10 | 388.00 | 13 |
2004-05-03 | Perforation | 396.50 | 397.50 | 13 |
2004-05-03 | Perforation | 404.00 | 408.00 | 13 |
2004-05-03 | Perforation | 428.30 | 429.00 | 13 |
2004-05-03 | Perforation | 443.00 | 443.80 | 13 |
2002-11-28 | Perforation | 693.00 | 695.50 | 17 |
2004-05-08 | Fracture | 515.00 | 533.50 | 0 |
2004-05-08 | Fracture | 709.00 | 711.00 | 0 |
2004-05-08 | Fracture | 244.00 | 443.80 | 0 |
2002-11-28 | Perforation | 740.00 | 741.00 | 17 |
2002-12-02 | Fracture | 774.50 | 776.50 | 0 |
2002-12-02 | Fracture | 740.00 | 741.00 | 0 |
2002-12-03 | Fracture | 579.50 | 695.50 | 0 |
2004-05-03 | Perforation | 515.00 | 517.00 | 13 |
2004-05-03 | Perforation | 532.00 | 533.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 7847 | 0.0 | 0.0 | 0.0 |
2004 | 2889 | 0.0 | 0.0 | 0.0 |
For data sources see[5]