If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394230901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.335123,"lon":-113.247625,"icon":""}]} |
Location: 00/01-09-039-23W4/0 | |
Location Alias: 00/01-09-39-23 W4M | |
Location Alias 2: 00/01-09-039-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 23 | |
Section: 09 | |
County/Municipality: Lacombe County | |
Well Name: EMBER ALIX 1-9-39-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0403635 | |
License Date: 2008-11-12 | |
License Status: Issued | |
Spud Date: 2009-01-20 | |
Final Drill Date: 2009-01-21 | |
Well Total Depth: 765.00 m | |
Surface Hole Latitude: 52.335123 | |
Surface Hole Longitude: -113.247625 |
Date | Event |
---|---|
2008-11-12 | Obtained License |
2009-01-20 | Surface Casing Operation Performed |
2009-01-21 | Finished Drilling |
2009-01-21 | Production Casing Operation Performed |
2009-01-21 | Rig Released |
2009-01-21 | Well Mode changed to Drilled and Cased |
2009-01-24 | Well Log Performed |
2009-01-31 | Perforation Treatment Performed - Jet Perforation |
2009-01-31 | Well Log Performed |
2009-02-02 | Perforation Treatment Performed - Jet Perforation |
2009-02-02 | Well Log Performed |
2009-02-03 | Perforation Treatment Performed - Jet Perforation |
2009-02-03 | Well Log Performed |
2009-02-05 | Perforation Treatment Performed - Jet Perforation |
2009-02-08 | Perforation Treatment Performed - Fractured |
2009-02-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-09 | Well Mode changed to Testing |
2009-06-23 | Well Began Production |
2009-06-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-06-23 | Well Mode changed to Flowing |
2010-07-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-07-05 | Well Mode changed to Suspended |
2010-12-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-31 | Perforation | 384.00 | 386.00 | 20 |
2009-02-05 | Perforation | 316.10 | 316.60 | 13 |
2009-02-05 | Perforation | 330.20 | 330.70 | 13 |
2009-02-05 | Perforation | 336.90 | 337.40 | 13 |
2009-02-05 | Perforation | 331.40 | 332.40 | 13 |
2009-02-05 | Perforation | 377.10 | 380.10 | 13 |
2009-02-05 | Perforation | 427.30 | 427.80 | 13 |
2009-02-05 | Perforation | 438.00 | 439.00 | 13 |
2009-02-05 | Perforation | 444.40 | 445.40 | 13 |
2009-02-05 | Perforation | 421.00 | 421.50 | 13 |
2009-02-05 | Perforation | 404.50 | 405.50 | 13 |
2009-02-02 | Perforation | 743.50 | 745.00 | 20 |
2009-02-05 | Perforation | 406.40 | 406.90 | 13 |
2009-02-05 | Perforation | 418.40 | 418.90 | 13 |
2009-02-08 | Fracture | 404.50 | 445.40 | 0 |
2009-02-08 | Fracture | 370.70 | 380.10 | 0 |
2009-02-08 | Fracture | 316.10 | 359.40 | 0 |
2009-02-08 | Fracture | 384.00 | 386.00 | 0 |
2009-02-08 | Fracture | 515.00 | 516.50 | 0 |
2009-02-08 | Fracture | 743.50 | 745.00 | 0 |
2009-02-03 | Perforation | 515.00 | 516.50 | 20 |
2009-02-05 | Perforation | 338.10 | 338.60 | 13 |
2009-02-05 | Perforation | 341.40 | 341.90 | 13 |
2009-02-05 | Perforation | 348.40 | 348.90 | 13 |
2009-02-05 | Perforation | 370.70 | 371.70 | 13 |
2009-02-05 | Perforation | 358.90 | 359.40 | 13 |
2009-02-05 | Perforation | 320.50 | 321.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1037 | 0.0 | 0.0 | 0.0 |
2010 | 624 | 0.0 | 0.0 | 0.0 |
2011 | 7965 | 0.0 | 0.0 | 0.0 |
2012 | 8392 | 0.0 | 0.0 | 0.0 |
2013 | 8394 | 0.0 | 0.0 | 0.0 |
2014 | 8532 | 0.0 | 0.0 | 0.0 |
2015 | 8658 | 0.0 | 0.0 | 0.0 |
2016 | 8753 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8742 | 0.0 | 0.0 | 0.0 |
2019 | 8700 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]