X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394222809000

Well Details

Well ID: 0394222809000
Loading map...
Location: 00/09-28-039-22W4/0
Location Alias: 00/09-28-39-22 W4M
Location Alias 2: 00/09-28-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 28
County/Municipality: Lacombe County
Well Name: JFEC NEVIS 9-28-39-22
Operator Name: Just Freehold Energy Corp.
License Number: 0331245
License Date: 2005-05-18
License Status: Issued
Spud Date: 2005-06-24
Final Drill Date: 2005-06-25
Well Total Depth: 743.50 m
Surface Hole Latitude: 52.386390
Surface Hole Longitude: -113.103803

For data sources see[1][2]

Well History

Date Event
2005-05-18 Obtained License
2005-06-24 Surface Casing Operation Performed
2005-06-25 Finished Drilling
2005-06-25 Production Casing Operation Performed
2005-06-25 Well Mode changed to Drilled and Cased
2005-06-26 Rig Released
2005-08-21 Well Log Performed
2005-09-04 Perforation Treatment Performed - Jet Perforation
2005-09-04 Well Log Performed
2005-09-11 Perforation Treatment Performed - Fractured
2005-10-31 Well Began Production
2005-10-31 Well Fluid changed to Coalbed Methane-Coals Only
2005-10-31 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-04 Perforation 377.50 378.50 13
2005-09-04 Perforation 279.50 280.00 13
2005-09-04 Perforation 273.50 275.00 13
2005-09-04 Perforation 205.00 206.00 13
2005-09-11 Fracture 377.50 378.50 0
2005-09-11 Fracture 367.00 368.00 0
2005-09-11 Fracture 371.50 372.00 0
2005-09-11 Fracture 357.00 357.50 0
2005-09-11 Fracture 355.50 356.00 0
2005-09-11 Fracture 324.50 327.50 0
2005-09-11 Fracture 319.00 320.00 0
2005-09-04 Perforation 371.50 372.00 13
2005-09-11 Fracture 288.50 291.50 0
2005-09-11 Fracture 286.50 287.00 0
2005-09-11 Fracture 279.50 280.00 0
2005-09-11 Fracture 273.50 275.00 0
2005-09-11 Fracture 205.00 206.00 0
2005-09-04 Perforation 367.00 368.00 13
2005-09-04 Perforation 357.00 357.50 13
2005-09-04 Perforation 355.50 356.00 13
2005-09-04 Perforation 324.50 327.50 13
2005-09-04 Perforation 319.00 320.00 13
2005-09-04 Perforation 288.50 291.50 13
2005-09-04 Perforation 286.50 287.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1464 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8434 0.0 0.0 0.0
2010 7758 0.0 0.0 0.0
2011 7717 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8039 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 6551 0.0 0.0 0.0
2016 8110 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 6389 0.0 0.0 0.0
2020 264 0.0 0.0 0.0

For data sources see[5]

References