X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394222807000

Well Details

Well ID: 0394222807000
Loading map...
Location: 00/07-28-039-22W4/0
Location Alias: 00/07-28-39-22 W4M
Location Alias 2: 00/07-28-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 28
County/Municipality: Lacombe County
Well Name: CNRL UNIT NEVIS 7-28-39-22
Operator Name: Canadian Natural Resources Limited
License Number: 0039330
License Date: 1970-12-09
License Status: Abandoned
Spud Date: 1970-12-11
Final Drill Date: 1970-12-30
Well Total Depth: 1793.70 m
Surface Hole Latitude: 52.380500
Surface Hole Longitude: -113.107086

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-12-09 Obtained License
1970-12-29 Drill Stem Test Performed
1970-12-30 Finished Drilling
1971-01-01 Production Casing Operation Performed
1971-02-07 Perforation Treatment Performed - Jet Perforation
1971-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-12 Well Mode changed to Drilled and Cased
1973-10-24 Well Fluid changed to Gas
1973-10-24 Well Mode changed to Testing
1973-10-25 Perforation Treatment Performed - Cement Squeeze
1973-10-25 Well Fluid changed to Gas
1973-10-25 Well Mode changed to Abandoned Zone
1973-11-03 Perforation Treatment Performed - Open-Hole Completion
1973-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-18 Plug Back Performed
1995-10-19 Perforation Treatment Performed - Jet Perforation
1995-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-19 Well Log Performed
2003-09-21 Well Log Performed
2003-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-24 Perforation Treatment Performed - Jet Perforation
2017-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-30 Perforation Treatment Performed - Cement Plug
2017-07-30 Well Log Performed
2017-07-31 Well Log Performed
2017-09-24 Perforation Treatment Performed - Jet Perforation
2017-09-25 Perforation Treatment Performed - Cement Plug
2017-09-25 Perforation Treatment Performed - Remedial Casing
2017-09-26 Perforation Treatment Performed - Cement Plug
2017-10-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-02-07 Perforation 1698.00 1699.90 13
1983-04-29 Acid Treatment 1734.30 1793.70 0
1984-02-21 Acid Treatment 1734.30 1793.70 0
1986-07-31 Acid Treatment 1734.30 1793.70 0
1995-10-18 Packing Device Capped w/Cement 1708.50 1710.50 0
1995-10-19 Perforation 1697.70 1699.70 13
1995-10-25 Acid Treatment 1697.70 1699.70 0
1995-11-11 Acid Treatment 1697.70 1699.70 0
2003-09-23 Packing Device Capped w/Cement 1705.00 1707.50 0
2003-09-24 Perforation 1699.50 1701.40 17
2017-07-30 Cement Plug 1703.50 1706.00 0
1971-02-08 Acid Treatment 1698.00 1699.90 0
2017-07-30 Packing Device Capped w/Cement 1677.80 1686.00 0
2017-09-24 Perforation 195.00 195.10 1
2017-09-24 Perforation 257.00 257.10 1
2017-09-24 Perforation 350.00 350.10 1
2017-09-24 Perforation 460.00 460.10 1
2017-09-25 Remedial Casing Cementing 195.00 460.10 0
2017-09-25 Cement Plug 257.00 480.00 0
2017-09-26 Cement Plug 79.00 257.00 0
1973-10-25 Cement Squeeze 1698.00 1699.90 0
1973-11-03 Open Hole/Barefoot Completion 1734.30 1793.70 0
1973-11-11 Acid Treatment 1734.30 1793.70 0
1975-01-30 Acid Treatment 1734.30 1793.70 0
1976-06-08 Acid Treatment 1734.30 1793.70 0
1977-04-21 Acid Treatment 1734.30 1793.70 0
1980-04-08 Acid Treatment 1734.30 1793.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 80 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-09-23 No Incident Encountered 0.00 0.00
2017-10-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References