X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394220907000

Well Details

Well ID: 0394220907000
Loading map...
Location: 00/07-09-039-22W4/0
Location Alias: 00/07-09-39-22 W4M
Location Alias 2: 00/07-09-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 09
County/Municipality: Lacombe County
Well Name: CDN-SUP WEST CDN NEVIS 7-9-39-22
Operator Name: ExxonMobil Canada Resources Company
License Number: 0015125
License Date: 1958-05-01
License Status: RecCertified
Spud Date: 1958-05-12
Final Drill Date: 1958-06-01
Well Total Depth: 1779.40 m
Surface Hole Latitude: 52.337736
Surface Hole Longitude: -113.108665

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-01 Obtained License
1958-05-22 Lost Circulation Occurred
1958-05-25 Drill Stem Test Performed
1958-06-01 Drill Stem Test Performed
1958-06-01 Finished Drilling
1958-06-01 Lost Circulation Occurred
1958-06-02 Production Casing Operation Performed
1958-06-04 Perforation Treatment Performed - Bullet Perforation
1958-06-04 Perforation Treatment Performed - Jet Perforation
1958-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-05 Perforation Treatment Performed - Acid Wash - No Pressure
1958-06-05 Well Mode changed to Drilled and Cased
1959-12-07 Well Began Production
1959-12-07 Well Fluid changed to Gas
1959-12-07 Well Mode changed to Flowing
1968-07-26 Perforation Treatment Performed - Jet Perforation
1968-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-21 Perforation Treatment Performed - Jet Perforation
1981-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-27 Perforation Treatment Performed - Jet Perforation
1987-10-01 Well Fluid changed to Gas
1987-10-01 Well Mode changed to Suspended
1990-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-31 Plug Back Performed
1990-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-01 Well Abandoned
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-04 Perforation 1743.50 1749.60 13
1990-10-31 Packing Device Capped w/Cement 1691.00 1699.00 0
1990-11-01 Packing Device Capped w/Cement 1288.00 1296.00 0
1958-06-04 Bullet Perforation 1743.50 1749.60 13
1958-06-05 Acid Wash 1743.50 1749.60 0
1958-06-05 Acid Treatment 1743.50 1749.60 0
1968-07-26 Perforation 1744.10 1753.20 3
1968-08-16 Acid Treatment 1743.50 1753.20 0
1981-10-21 Perforation 1735.50 1744.40 13
1981-10-22 Acid Treatment 1735.50 1753.20 0
1981-10-27 Perforation 1744.00 1744.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 6704 0.0 0.0 0.0
1970 7866 0.0 0.0 0.0
1971 3398 0.0 0.0 0.0
1972 5002 0.0 0.0 0.0
1973 8299 0.0 0.0 0.0
1974 7896 0.0 0.0 0.0
1975 7915 0.0 0.0 0.0
1976 8183 0.0 0.0 0.0
1977 8376 0.0 0.0 0.0
1978 8688 0.0 0.0 0.0
1979 8644 0.0 0.0 0.0
1980 8396 0.0 0.0 0.0
1981 4691 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-05-22 Lost Circulation 1429.50 1430.70
1958-06-01 Lost Circulation 1779.40 1779.40

For data sources see[6]

References