X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394220810000

Well Details

Well ID: 0394220810000
Loading map...
Location: 00/10-08-039-22W4/0
Location Alias: 00/10-08-39-22 W4M
Location Alias 2: 00/10-08-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 08
County/Municipality: Lacombe County
Well Name: CNRL NEVIS 10-8-39-22
Operator Name: Canadian Natural Resources Limited
License Number: 0005801
License Date: 1952-12-11
License Status: Issued
Spud Date: 1952-12-13
Final Drill Date: 1953-01-23
Well Total Depth: 1876.00 m
Surface Hole Latitude: 52.341304
Surface Hole Longitude: -113.132656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-11 Obtained License
1952-12-25 Drill Stem Test Performed
1952-12-27 Drill Stem Test Performed
1952-12-28 Drill Stem Test Performed
1953-01-02 Drill Stem Test Performed
1953-01-17 Drill Stem Test Performed
1953-01-18 Drill Stem Test Performed
1953-01-19 Drill Stem Test Performed
1953-01-20 Drill Stem Test Performed
1953-01-23 Finished Drilling
1953-01-23 Well Mode changed to Drilled and Cased
1953-01-25 Production Casing Operation Performed
1953-01-28 Perforation Treatment Performed - Jet Perforation
1953-01-29 Perforation Treatment Performed - Cement Squeeze
1953-01-31 Perforation Treatment Performed - Jet Perforation
1953-02-01 Perforation Treatment Performed - Jet Perforation
1953-02-03 Perforation Treatment Performed - Cement Squeeze
1959-09-04 Perforation Treatment Performed - Jet Perforation
1959-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-06 Perforation Treatment Performed - Bullet Perforation
1970-06-10 Perforation Treatment Performed - Cement Squeeze
1970-06-12 Perforation Treatment Performed - Open-Hole Completion
1970-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-01 Well Began Injection
1970-07-01 Well Fluid changed to Water
1970-07-01 Well Type changed to Disposal
1979-03-07 Perforation Treatment Performed - Acid Wash - No Pressure
1991-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-12 Plug Back Performed
1998-06-12 Well Fluid changed to Water
1998-06-12 Well Log Performed
1998-06-12 Well Mode changed to Abandoned Zone
1998-06-12 Well Type changed to Disposal
1998-06-15 Perforation Treatment Performed - Jet Perforation
1998-06-15 Well Log Performed
1998-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-16 Plug Back Performed
1998-06-17 Perforation Treatment Performed - Jet Perforation
1998-06-17 Well Log Performed
2002-09-17 Well Log Performed
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-09-20 Well Log Performed
2002-09-22 Well Log Performed
2002-09-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-28 Perforation 1800.50 1802.90 13
1959-09-06 Acid Treatment 1760.20 1760.80 0
1970-06-10 Cement Squeeze 1742.20 1780.90 0
1970-06-12 Open Hole/Barefoot Completion 1813.60 1876.00 0
1970-06-18 Acid Treatment 1813.60 1876.00 0
1979-03-07 Acid Wash 1813.60 1876.00 0
1991-02-14 Acid Treatment 1813.60 1876.00 0
1993-09-29 Acid Treatment 1813.60 1876.00 0
1998-06-12 Packing Device Capped w/Cement 1718.50 1726.50 0
1998-06-12 Packing Device Capped w/Cement 1528.00 1536.00 0
1998-06-15 Perforation 1484.00 1487.00 17
1953-01-29 Cement Squeeze 1800.50 1802.90 0
1998-06-16 Packing Device Capped w/Cement 1465.00 1473.00 0
1998-06-17 Perforation 1449.00 1452.00 17
2002-09-20 Perforation 1433.00 1437.00 17
2002-09-25 Fracture 1433.00 1437.00 0
1953-01-31 Perforation 1778.20 1780.90 13
1953-02-01 Perforation 1760.20 1762.40 13
1953-02-03 Cement Squeeze 1760.20 1762.40 0
1959-09-04 Perforation 1751.10 1754.10 13
1959-09-04 Perforation 1742.20 1743.50 13
1959-09-05 Acid Treatment 1742.20 1754.10 0
1959-09-06 Bullet Perforation 1760.20 1760.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

References