X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394220406000

Well Details

Well ID: 0394220406000
Loading map...
Location: 00/06-04-039-22W4/0
Location Alias: 00/06-04-39-22 W4M
Location Alias 2: 00/06-04-039-22 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 22
Section: 04
County/Municipality: Lacombe County
Well Name: PAM AM B-1 NEVIS 6-4-39-22
Operator Name: Canadian Natural Resources Limited
License Number: 0016552
License Date: 1959-01-08
License Status: RecCertified
Spud Date: 1959-01-17
Final Drill Date: 1959-02-21
Well Total Depth: 1684.00 m
Surface Hole Latitude: 52.323154
Surface Hole Longitude: -113.114583

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-01-08 Obtained License
1959-02-03 Drill Stem Test Performed
1959-02-04 Drill Stem Test Performed
1959-02-21 Drill Stem Test Performed
1959-02-21 Finished Drilling
1959-02-22 Production Casing Operation Performed
1959-03-10 Well Mode changed to Drilled and Cased
1959-09-23 Perforation Treatment Performed - Bullet Perforation
1959-12-07 Well Began Production
1959-12-07 Well Fluid changed to Gas
1959-12-07 Well Mode changed to Flowing
1960-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-12 Perforation Treatment Performed - Jet Perforation
1968-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-26 Well Fluid changed to Gas
1978-01-26 Well Mode changed to Suspended
1979-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-15 Well Abandoned
1979-10-15 Well Fluid changed to Gas
1979-10-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-23 Bullet Perforation 1643.50 1649.60 13
1960-03-09 Acid Treatment 1643.50 1649.60 0
1968-09-12 Perforation 1641.00 1642.90 7
1968-09-12 Perforation 1631.90 1638.60 7
1968-09-13 Acid Treatment 1631.90 1649.60 0
1976-02-13 Packing Device Capped w/Cement 1637.40 1640.70 0
1979-10-15 Packing Device Capped w/Cement 1596.00 1596.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 5624 0.0 0.0 0.0
1970 7649 0.0 0.0 0.0
1971 7667 0.0 0.0 0.0
1972 8235 0.0 0.0 0.0
1973 8268 0.0 0.0 0.0
1974 7894 0.0 0.0 0.0
1975 7516 0.0 0.0 0.0
1976 7555 0.0 0.0 0.0
1977 7679 0.0 0.0 0.0

For data sources see[5]

References