If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394211704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.348197,"lon":-113.000192,"icon":""}]} |
Location: 00/04-17-039-21W4/0 | |
Location Alias: 00/04-17-39-21 W4M | |
Location Alias 2: 00/04-17-039-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 21 | |
Section: 17 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: 1107882 ACC UNIT NEVIS 4-17-39-21 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0030592 | |
License Date: 1966-06-21 | |
License Status: Abandoned | |
Spud Date: 1966-06-21 | |
Final Drill Date: 1966-07-04 | |
Well Total Depth: 1746.50 m | |
Surface Hole Latitude: 52.348197 | |
Surface Hole Longitude: -113.000192 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-06-21 | Obtained License |
1966-07-04 | Finished Drilling |
1966-07-05 | Drill Stem Test Performed |
1966-07-09 | Production Casing Operation Performed |
1966-08-13 | Well Mode changed to Drilled and Cased |
1972-11-02 | Perforation Treatment Performed - Jet Perforation |
1972-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-02-06 | Well Began Production |
1973-02-06 | Well Fluid changed to Gas |
1973-02-06 | Well Mode changed to Flowing |
1978-10-10 | Perforation Treatment Performed - Cement Plug |
1989-09-30 | Well Fluid changed to Gas |
1989-09-30 | Well Mode changed to Suspended |
1991-02-19 | Well Log Performed |
1991-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-02-21 | Perforation Treatment Performed - Jet Perforation |
1991-02-21 | Perforation Treatment Performed - Remedial Casing |
1991-02-21 | Plug Back Performed |
1991-02-21 | Well Fluid changed to Gas |
1991-02-21 | Well Log Performed |
1991-02-21 | Well Mode changed to Abandoned |
2006-08-22 | Perforation Treatment Performed - Jet Perforation |
2006-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-24 | Perforation Treatment Performed - Remedial Casing |
2006-08-24 | Well Log Performed |
2006-08-25 | Perforation Treatment Performed - Jet Perforation |
2006-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-26 | Perforation Treatment Performed - Remedial Casing |
2006-08-26 | Well Log Performed |
2006-08-27 | Perforation Treatment Performed - Jet Perforation |
2006-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-28 | Perforation Treatment Performed - Remedial Casing |
2006-08-28 | Well Log Performed |
2006-08-29 | Perforation Treatment Performed - Jet Perforation |
2006-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-30 | Perforation Treatment Performed - Remedial Casing |
2006-09-01 | Well Log Performed |
2006-09-02 | Perforation Treatment Performed - Jet Perforation |
2006-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-06 | Perforation Treatment Performed - Remedial Casing |
2006-09-06 | Well Log Performed |
2006-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-07 | Perforation Treatment Performed - Jet Perforation |
2006-09-07 | Perforation Treatment Performed - Remedial Casing |
2006-09-08 | Well Log Performed |
2006-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-09 | Perforation Treatment Performed - Jet Perforation |
2006-09-09 | Perforation Treatment Performed - Remedial Casing |
2006-09-10 | Well Log Performed |
2006-09-11 | Perforation Treatment Performed - Jet Perforation |
2006-09-11 | Perforation Treatment Performed - Remedial Casing |
2006-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-12 | Well Log Performed |
2006-09-13 | Perforation Treatment Performed - Jet Perforation |
2006-09-13 | Perforation Treatment Performed - Remedial Casing |
2006-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-14 | Well Log Performed |
2006-09-15 | Perforation Treatment Performed - Jet Perforation |
2006-09-15 | Perforation Treatment Performed - Remedial Casing |
2006-09-16 | Perforation Treatment Performed - Remedial Casing |
2006-09-16 | Well Log Performed |
2006-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-17 | Perforation Treatment Performed - Jet Perforation |
2006-09-17 | Well Log Performed |
2006-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-18 | Perforation Treatment Performed - Jet Perforation |
2006-09-18 | Perforation Treatment Performed - Remedial Casing |
2006-09-18 | Well Log Performed |
2006-09-19 | Perforation Treatment Performed - Jet Perforation |
2006-09-19 | Perforation Treatment Performed - Remedial Casing |
2006-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-11-02 | Perforation | 1686.80 | 1694.70 | 7 |
2006-08-24 | Packing Device Capped w/Cement | 850.00 | 858.00 | 0 |
2006-08-25 | Perforation | 826.00 | 826.50 | 13 |
2006-08-26 | Remedial Casing Cementing | 826.00 | 826.50 | 0 |
2006-08-26 | Packing Device Capped w/Cement | 803.00 | 816.00 | 0 |
2006-08-27 | Perforation | 767.00 | 767.50 | 13 |
2006-08-28 | Remedial Casing Cementing | 767.00 | 767.50 | 0 |
2006-08-28 | Packing Device Capped w/Cement | 738.00 | 755.00 | 0 |
2006-08-29 | Perforation | 706.00 | 706.50 | 13 |
2006-08-30 | Remedial Casing Cementing | 706.00 | 706.50 | 0 |
2006-08-30 | Packing Device Capped w/Cement | 638.00 | 696.00 | 0 |
1972-11-04 | Acid Treatment | 1686.80 | 1694.70 | 0 |
2006-09-02 | Perforation | 620.00 | 620.50 | 13 |
2006-09-06 | Remedial Casing Cementing | 620.00 | 620.50 | 0 |
2006-09-06 | Packing Device Capped w/Cement | 570.00 | 582.00 | 0 |
2006-09-07 | Perforation | 569.00 | 569.50 | 13 |
2006-09-07 | Remedial Casing Cementing | 569.00 | 569.50 | 0 |
2006-09-07 | Packing Device Capped w/Cement | 554.00 | 565.00 | 0 |
2006-09-07 | Perforation | 450.00 | 450.50 | 13 |
2006-09-09 | Remedial Casing Cementing | 450.00 | 450.50 | 0 |
2006-09-09 | Packing Device Capped w/Cement | 434.00 | 445.00 | 0 |
2006-09-09 | Perforation | 255.00 | 255.50 | 13 |
1978-10-10 | Cement Plug | 1692.50 | 1696.10 | 0 |
2006-09-11 | Perforation | 308.00 | 308.50 | 13 |
2006-09-11 | Remedial Casing Cementing | 308.00 | 308.50 | 0 |
2006-09-12 | Packing Device Capped w/Cement | 293.00 | 304.00 | 0 |
2006-09-13 | Perforation | 283.00 | 283.50 | 13 |
2006-09-13 | Remedial Casing Cementing | 283.00 | 283.50 | 0 |
2006-09-14 | Packing Device Capped w/Cement | 271.00 | 279.00 | 0 |
2006-09-15 | Perforation | 267.50 | 268.00 | 13 |
2006-09-15 | Remedial Casing Cementing | 267.50 | 268.00 | 0 |
2006-09-16 | Remedial Casing Cementing | 255.00 | 255.50 | 0 |
2006-09-17 | Packing Device Capped w/Cement | 241.00 | 265.00 | 0 |
1978-10-10 | Cement Plug | 1691.20 | 1692.50 | 0 |
2006-09-17 | Perforation | 237.00 | 237.50 | 13 |
2006-09-17 | Perforation | 172.00 | 172.50 | 13 |
2006-09-18 | Perforation | 208.00 | 208.50 | 13 |
2006-09-18 | Remedial Casing Cementing | 237.00 | 237.50 | 0 |
2006-09-18 | Packing Device Capped w/Cement | 226.00 | 234.00 | 0 |
2006-09-19 | Perforation | 200.00 | 200.50 | 13 |
2006-09-19 | Remedial Casing Cementing | 208.00 | 208.50 | 0 |
2006-09-19 | Remedial Casing Cementing | 200.00 | 200.50 | 0 |
2006-09-19 | Remedial Casing Cementing | 172.00 | 172.50 | 0 |
2006-09-20 | Packing Device Capped w/Cement | 156.00 | 196.00 | 0 |
1991-02-21 | Packing Device Capped w/Cement | 1666.60 | 1677.00 | 0 |
1991-02-21 | Perforation | 205.00 | 205.50 | 20 |
1991-02-21 | Remedial Casing Cementing | 205.00 | 205.50 | 0 |
2006-08-22 | Perforation | 865.00 | 865.50 | 13 |
2006-08-24 | Remedial Casing Cementing | 865.00 | 865.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 9 | 0.0 | 0.0 | 0.0 |
1973 | 7668 | 0.0 | 0.0 | 0.0 |
1974 | 6969 | 0.0 | 0.0 | 0.0 |
1975 | 8137 | 0.0 | 0.0 | 0.0 |
1976 | 8448 | 0.0 | 0.0 | 0.0 |
1977 | 5332 | 0.0 | 0.0 | 0.0 |
1978 | 6154 | 0.0 | 0.0 | 0.0 |
1979 | 8453 | 0.0 | 0.0 | 0.0 |
1980 | 6350 | 0.0 | 0.0 | 0.0 |
1981 | 3200 | 0.0 | 0.0 | 0.0 |
1982 | 1420 | 0.0 | 0.0 | 0.0 |
1983 | 8595 | 0.0 | 0.0 | 0.0 |
1984 | 8783 | 0.0 | 0.0 | 0.0 |
1985 | 8737 | 0.0 | 0.0 | 0.0 |
1986 | 8386 | 0.0 | 0.0 | 0.0 |
1987 | 3848 | 0.0 | 0.0 | 0.0 |
For data sources see[5]