X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394183110002

Well Details

Well ID: 0394183110002
Loading map...
Location: 00/10-31-039-18W4/2
Location Alias: 00/10-31-39-18 W4M
Location Alias 2: 00/10-31-039-18 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 18
Section: 31
County/Municipality: County of Stettler No. 6
Well Name: ACL LEAHURST 10-31-39-18
Operator Name: Paramount Resources Ltd.
License Number: 0032879
License Date: 1967-10-06
License Status: RecCertified
Spud Date: 1967-10-12
Final Drill Date: 1967-10-18
Well Total Depth: 1289.60 m
Surface Hole Latitude: 52.399241
Surface Hole Longitude: -112.581082

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-01 Perforation Treatment Performed - Fractured
1967-10-01 Perforation Treatment Performed - Jet Perforation
1967-10-06 Obtained License
1967-10-18 Drill Stem Test Performed
1967-10-18 Finished Drilling
1967-10-18 Well Mode changed to Drilled and Cased
1967-10-19 Production Casing Operation Performed
1999-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-27 Plug Back Performed
1999-08-27 Well Log Performed
1999-08-28 Perforation Treatment Performed - Jet Perforation
1999-08-28 Well Log Performed
1999-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-29 Perforation Treatment Performed - Jet Perforation
1999-08-29 Plug Back Performed
1999-08-29 Well Log Performed
1999-08-29 Well Mode changed to Abandoned Zone
1999-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-31 Perforation Treatment Performed - Jet Perforation
1999-08-31 Plug Back Performed
1999-08-31 Well Log Performed
1999-09-10 Perforation Treatment Performed - Fractured
1999-10-01 Well Log Performed
2000-06-07 Well Log Performed
2000-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-06 Perforation Treatment Performed - Jet Perforation
2000-07-06 Plug Back Performed
2000-07-08 Perforation Treatment Performed - Cement Plug
2000-07-08 Perforation Treatment Performed - Remedial Casing
2000-08-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-10-01 Perforation 1268.30 1271.30 13
1999-08-31 Packing Device Capped w/Cement 1201.00 1209.00 0
1999-08-31 Perforation 1090.00 1092.00 13
1999-08-31 Perforation 1086.00 1089.00 13
1999-09-10 Fracture 1086.00 1092.00 0
2000-07-06 Packing Device Capped w/Cement 1067.00 1083.00 0
2000-07-06 Perforation 220.00 221.00 13
2000-07-08 Remedial Casing Cementing 220.00 221.00 0
2000-07-08 Cement Plug 191.00 213.00 0
1967-10-01 Perforation 1275.60 1277.40 13
1967-10-01 Acid Treatment 1268.30 1277.40 0
1967-10-01 Fracture 1268.30 1277.40 0
1999-08-27 Packing Device Capped w/Cement 1257.00 1265.00 0
1999-08-28 Perforation 1248.00 1249.50 13
1999-08-28 Perforation 1237.50 1240.00 13
1999-08-29 Packing Device Capped w/Cement 1227.00 1235.00 0
1999-08-29 Perforation 1213.00 1214.50 13

For data sources see[4]



References