If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394181811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.355635,"lon":-112.588169,"icon":""}]} |
Location: 00/11-18-039-18W4/0 | |
Location Alias: 00/11-18-39-18 W4M | |
Location Alias 2: 00/11-18-039-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 18 | |
Section: 18 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: 1107882 ACC STETTLER NO.11-18 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0001514 | |
License Date: 1950-05-26 | |
License Status: RecCertified | |
Spud Date: 1950-06-01 | |
Final Drill Date: 1950-07-30 | |
Well Total Depth: 1773.00 m | |
Surface Hole Latitude: 52.355635 | |
Surface Hole Longitude: -112.588169 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-05-26 | Obtained License |
1950-06-12 | Drill Stem Test Performed |
1950-06-16 | Drill Stem Test Performed |
1950-06-17 | Drill Stem Test Performed |
1950-06-20 | Drill Stem Test Performed |
1950-06-23 | Drill Stem Test Performed |
1950-06-25 | Drill Stem Test Performed |
1950-06-28 | Drill Stem Test Performed |
1950-06-29 | Drill Stem Test Performed |
1950-07-01 | Drill Stem Test Performed |
1950-07-10 | Drill Stem Test Performed |
1950-07-25 | Drill Stem Test Performed |
1950-07-30 | Finished Drilling |
1950-08-01 | Production Casing Operation Performed |
1950-08-01 | Well Mode changed to Drilled and Cased |
1950-08-03 | Perforation Treatment Performed - Bullet Perforation |
1950-08-04 | Perforation Treatment Performed - Cement Squeeze |
1950-08-05 | Perforation Treatment Performed - Bullet Perforation |
1950-08-06 | Perforation Treatment Performed - Cement Squeeze |
1954-09-07 | Perforation Treatment Performed - Jet Perforation |
1954-09-08 | Perforation Treatment Performed - Fractured |
1954-09-10 | Perforation Treatment Performed - Bullet Perforation |
1954-12-02 | Well Began Production |
1954-12-02 | Well Fluid changed to Gas |
1954-12-02 | Well Mode changed to Flowing |
1978-11-02 | Well Fluid changed to Gas |
1978-11-02 | Well Mode changed to Suspended |
1995-05-06 | Well Log Performed |
1995-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-06-05 | Plug Back Performed |
1995-06-06 | Well Log Performed |
1995-06-09 | Perforation Treatment Performed - Jet Perforation |
1995-06-09 | Well Log Performed |
1995-06-10 | Perforation Treatment Performed - Remedial Casing |
1995-06-10 | Well Fluid changed to Gas |
1995-06-10 | Well Mode changed to Abandoned |
1995-06-13 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-08-03 | Bullet Perforation | 1266.40 | 1267.10 | 13 |
1995-06-10 | Remedial Casing Cementing | 268.00 | 269.00 | 0 |
1950-08-04 | Cement Squeeze | 1266.40 | 1267.10 | 0 |
1950-08-05 | Bullet Perforation | 1268.90 | 1270.70 | 13 |
1950-08-06 | Cement Squeeze | 1268.90 | 1270.70 | 0 |
1954-09-07 | Perforation | 1269.80 | 1271.00 | 13 |
1954-09-08 | Fracture | 1269.80 | 1271.00 | 0 |
1954-09-10 | Bullet Perforation | 1258.80 | 1260.30 | 13 |
1995-06-05 | Packing Device Capped w/Cement | 1237.00 | 1245.00 | 0 |
1995-06-09 | Perforation | 268.00 | 269.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 4872 | 0.0 | 0.0 | 0.0 |
1970 | 7315 | 0.0 | 0.0 | 0.0 |
1971 | 5400 | 0.0 | 0.0 | 0.0 |
1972 | 3840 | 0.0 | 0.0 | 0.0 |
1973 | 3816 | 0.0 | 0.0 | 0.0 |
1974 | 2784 | 0.0 | 0.0 | 0.0 |
1975 | 3084 | 0.0 | 0.0 | 0.0 |
1976 | 2304 | 0.0 | 0.0 | 0.0 |
For data sources see[5]