X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394162710000

Well Details

Well ID: 0394162710000
Loading map...
Location: 00/10-27-039-16W4/0
Location Alias: 00/10-27-39-16 W4M
Location Alias 2: 00/10-27-039-16 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 16
Section: 27
County/Municipality: County of Paintearth No. 18
Well Name: PENN WEST REDWILOW 10-27-39-16
Operator Name: Obsidian Energy Ltd.
License Number: 0229739
License Date: 1999-12-04
License Status: Abandoned
Spud Date: 1999-12-10
Final Drill Date: 1999-12-14
Well Total Depth: 1162.00 m
Surface Hole Latitude: 52.384558
Surface Hole Longitude: -112.223373

For data sources see[1][2]

Well History

Date Event
1999-12-04 Obtained License
1999-12-11 Surface Casing Operation Performed
1999-12-12 Direction Drilling Operation Performed - Deviate
1999-12-14 Finished Drilling
1999-12-15 Well Log Performed
1999-12-16 Production Casing Operation Performed
1999-12-16 Rig Released
1999-12-16 Well Log Performed
1999-12-16 Well Mode changed to Drilled and Cased
2000-01-03 Well Log Performed
2000-01-04 Well Log Performed
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-03-26 Well Began Production
2000-03-26 Well Fluid changed to Gas
2000-03-26 Well Mode changed to Flowing
2002-05-09 Perforation Treatment Performed - Jet Perforation
2005-01-29 Perforation Treatment Performed - Jet Perforation
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Suspended
2019-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-28 Plug Back Performed
2019-09-28 Well Fluid changed to Gas
2019-09-28 Well Log Performed
2019-09-28 Well Mode changed to Abandoned Zone
2019-09-29 Well Log Performed
2019-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-30 Perforation Treatment Performed - Cement Squeeze
2019-09-30 Perforation Treatment Performed - Jet Perforation
2019-09-30 Plug Back Performed
2019-09-30 Well Log Performed
2019-10-01 Perforation Treatment Performed - Cement Plug
2019-10-01 Plug Back Performed
2019-10-04 Perforation Treatment Performed - Jet Perforation
2019-10-04 Well Log Performed
2019-10-05 Perforation Treatment Performed - Cement Plug
2019-10-05 Perforation Treatment Performed - Cement Squeeze
2019-10-05 Plug Back Performed
2019-11-12 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-12-12 776.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-05 Perforation 1122.00 1128.00 13
2019-10-01 Cement Plug 237.00 245.00 0
2019-10-04 Perforation 181.00 182.00 17
2019-10-05 Cement Squeeze 181.00 182.00 0
2019-10-05 Cement Plug 168.00 176.50 0
2002-05-09 Perforation 1130.30 1132.30 17
2005-01-29 Perforation 1125.00 1128.00 20
2005-01-29 Perforation 1122.00 1125.00 20
2019-09-28 Packing Device Capped w/Cement 1108.00 1116.00 0
2019-09-30 Perforation 336.00 337.00 17
2019-09-30 Packing Device Capped w/Cement 317.00 325.00 0
2019-09-30 Perforation 249.50 250.50 17
2019-09-30 Cement Squeeze 249.50 250.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6140 0.0 0.0 0.0
2001 8210 0.0 0.0 0.0
2002 8381 0.0 0.0 0.0
2003 8047 0.0 0.0 0.0
2004 7694 0.0 0.0 0.0
2005 7779 0.0 0.0 0.0
2006 8274 0.0 0.0 0.0
2007 8530 0.0 0.0 0.0
2008 8556 0.0 0.0 0.0
2009 8460 0.0 0.0 0.0
2010 8599 0.0 0.0 0.0
2011 8538 0.0 0.0 0.0
2012 8259 0.0 0.0 0.0
2013 8374 0.0 0.0 0.0
2014 7865 0.0 0.0 0.0
2015 7771 0.0 0.0 0.0
2016 6539 0.0 0.0 0.0
2017 2202 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References