X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394161208002

Well Details

Well ID: 0394161208002
Loading map...
Location: 00/08-12-039-16W4/2
Location Alias: 00/08-12-39-16 W4M
Location Alias 2: 00/08-12-039-16 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 16
Section: 12
County/Municipality: County of Paintearth No. 18
Well Name: CAPSTONE REDWILOW 8-12-39-16
Operator Name: Obsidian Energy Ltd.
License Number: 0135251
License Date: 1988-07-29
License Status: Abandoned
Spud Date: 1988-10-07
Final Drill Date: 1988-10-10
Well Total Depth: 1189.00 m
Surface Hole Latitude: 52.336409
Surface Hole Longitude: -112.168910

For data sources see[1][2]

Well History

Date Event
1988-07-29 Obtained License
1988-10-08 Surface Casing Operation Performed
1988-10-10 Finished Drilling
1988-10-10 Well Mode changed to Drilled and Cased
1988-10-11 Drill Stem Test Performed
1988-10-11 Well Log Performed
1988-10-13 Production Casing Operation Performed
1988-10-13 Rig Released
1988-11-02 Well Log Performed
1988-11-03 Well Log Performed
1988-11-04 Perforation Treatment Performed - Jet Perforation
1998-04-24 Perforation Treatment Performed - Jet Perforation
1998-04-24 Well Log Performed
2003-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-23 Plug Back Performed
2003-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-24 Perforation Treatment Performed - Jet Perforation
2003-04-24 Plug Back Performed
2003-04-25 Perforation Treatment Performed - Fractured
2003-05-01 Well Began Production
2003-05-01 Well Fluid changed to Gas
2003-05-01 Well Mode changed to Flowing
2010-01-01 Well Fluid changed to Gas
2010-01-01 Well Mode changed to Pumping
2011-07-21 Well Fluid changed to Gas
2011-07-21 Well Mode changed to Suspended
2019-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-03 Perforation Treatment Performed - Cement Squeeze
2019-08-03 Perforation Treatment Performed - Jet Perforation
2019-08-03 Plug Back Performed
2019-08-03 Well Fluid changed to Gas
2019-08-03 Well Log Performed
2019-08-03 Well Mode changed to Abandoned Zone
2019-08-04 Perforation Treatment Performed - Cement Plug
2019-09-09 Well Abandoned
2019-09-09 Well Fluid changed to Gas
2019-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-04 Perforation 1143.00 1145.50 13
2019-08-03 Cement Squeeze 310.00 311.00 0
2019-08-03 Cement Squeeze 285.00 286.00 0
2019-08-03 Packing Device Capped w/Cement 970.00 978.00 0
2019-08-04 Cement Plug 254.50 300.80 0
1988-11-04 Perforation 1147.00 1148.00 13
1998-04-24 Perforation 1117.00 1120.00 17
2003-04-23 Packing Device Capped w/Cement 1134.00 1142.00 0
2003-04-24 Perforation 984.00 987.00 13
2003-04-24 Packing Device Capped w/Cement 1108.00 1116.00 0
2003-04-25 Fracture 984.00 987.00 0
2019-08-03 Perforation 310.00 311.00 17
2019-08-03 Perforation 285.00 286.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5223 0.0 0.0 0.0
2004 8669 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7638 0.0 0.0 0.0
2007 8542 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 5123 0.0 0.0 0.0
2010 1290 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References