X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394122906000

Well Details

Well ID: 0394122906000
Loading map...
Location: 00/06-29-039-12W4/0
Location Alias: 00/06-29-39-12 W4M
Location Alias 2: 00/06-29-039-12 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 12
Section: 29
County/Municipality: Flagstaff County
Well Name: ACL PROVOST 6-29-39-12
Operator Name: Karve Energy Inc.
License Number: 0062327
License Date: 1977-01-24
License Status: Issued
Spud Date: 1977-02-01
Final Drill Date: 1977-02-06
Well Total Depth: 993.60 m
Surface Hole Latitude: 52.380277
Surface Hole Longitude: -111.700790

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-01-24 Obtained License
1977-02-04 Drill Stem Test Performed
1977-02-06 Drill Stem Test Performed
1977-02-06 Finished Drilling
1977-02-07 Drill Stem Test Performed
1977-02-08 Production Casing Operation Performed
1977-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-03 Perforation Treatment Performed - Jet Perforation
1977-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-04 Perforation Treatment Performed - Jet Perforation
1977-06-06 Perforation Treatment Performed - Cement Plug
1977-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-07 Perforation Treatment Performed - Fractured
1977-06-07 Perforation Treatment Performed - Jet Perforation
1977-09-21 Well Mode changed to Drilled and Cased
1999-03-01 Well Began Production
1999-03-01 Well Fluid changed to Gas
1999-03-01 Well Mode changed to Flowing
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-03 Perforation 955.20 955.90 7
1977-06-03 Acid Treatment 955.20 955.90 0
1977-06-04 Perforation 947.30 949.10 7
1977-06-04 Acid Treatment 947.30 949.10 0
1977-06-06 Cement Plug 898.60 898.60 0
1977-06-07 Perforation 820.20 826.60 3
1977-06-07 Perforation 817.80 819.90 3
1977-06-07 Acid Treatment 817.80 826.60 0
1977-06-07 Fracture 817.80 826.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6828 0.0 0.0 0.0
2000 7279 0.0 0.0 0.0
2001 8292 0.0 0.0 0.0
2002 7304 0.0 0.0 0.0
2003 7398 0.0 0.0 0.0
2004 6069 0.0 0.0 0.0
2005 6527 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 4248 0.0 0.0 0.0
2008 6600 0.0 0.0 0.0
2009 4490 0.0 0.0 0.0
2010 8687 0.0 0.0 0.0
2011 8160 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 7679 0.0 0.0 0.0
2014 8088 0.0 0.0 0.0
2015 5470 0.0 0.0 0.0
2016 3594 0.0 0.0 0.0
2017 7140 0.0 0.0 0.0
2018 7583 0.0 0.0 0.0
2019 6585 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[5]

References