X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394113612002

Well Details

Well ID: 0394113612002
Loading map...
Location: 00/12-36-039-11W4/2
Location Alias: 00/12-36-39-11 W4M
Location Alias 2: 00/12-36-039-11 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 11
Section: 36
County/Municipality: Flagstaff County
Well Name: ACL PROVOST 12-36-39-11
Operator Name: Karve Energy Inc.
License Number: 0022608
License Date: 1962-06-18
License Status: Suspension
Spud Date: 1962-06-23
Final Drill Date: 1962-07-01
Well Total Depth: 980.80 m
Surface Hole Latitude: 52.399296
Surface Hole Longitude: -111.465115

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-18 Obtained License
1962-07-01 Finished Drilling
1962-07-01 Well Mode changed to Drilled and Cased
1962-07-03 Drill Stem Test Performed
1962-07-03 Production Casing Operation Performed
1962-07-04 Perforation Treatment Performed - Jet Perforation
1962-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-07 Perforation Treatment Performed - Cement Squeeze
1962-07-12 Perforation Treatment Performed - Jet Perforation
1974-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-07-04 Perforation Treatment Performed - Jet Perforation
1974-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-01 Well Began Production
1974-11-01 Well Fluid changed to Gas
1974-11-01 Well Mode changed to Flowing
1987-03-17 Perforation Treatment Performed - Jet Perforation
1987-03-18 Perforation Treatment Performed - Fractured
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2016-10-06 Well Fluid changed to Gas
2016-10-06 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-07-04 Perforation 891.50 892.50 13
1987-03-18 Fracture 749.80 754.70 0
1962-07-05 Acid Treatment 891.50 892.50 0
1962-07-07 Cement Squeeze 891.50 892.50 0
1962-07-12 Perforation 874.20 877.20 13
1974-07-04 Packing Device Capped w/Cement 868.70 868.70 0
1974-07-04 Perforation 749.80 751.30 7
1974-07-06 Acid Treatment 749.80 751.30 0
1987-03-17 Perforation 749.80 752.20 13
1987-03-17 Perforation 753.50 754.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1106 0.0 0.0 0.0
1975 7410 0.0 0.0 0.0
1976 8138 0.0 0.0 0.0
1977 8551 0.0 0.0 0.0
1978 5888 0.0 0.0 0.0
1979 6043 0.0 0.0 0.0
1980 5028 0.0 0.0 0.0
1981 6101 0.0 0.0 0.0
1982 1820 0.0 0.0 0.0
1983 24 0.0 0.0 0.0
1984 7248 0.0 0.0 0.0
1985 8537 0.0 0.0 0.0
1986 2373 0.0 0.0 0.0
1987 2215 0.0 0.0 0.0
1988 6039 0.0 0.0 0.0
1989 7498 0.0 0.0 0.0
1990 5826 0.0 0.0 0.0
1991 8304 0.0 0.0 0.0
1992 8202 0.0 0.0 0.0
1993 7972 0.0 0.0 0.0
1994 8409 0.0 0.0 0.0
1995 7436 0.0 0.0 0.0
1996 8185 0.0 0.0 0.0
1997 8141 0.0 0.0 0.0
1998 8387 0.0 0.0 0.0
1999 6925 0.0 0.0 0.0
2000 7333 0.0 0.0 0.0
2001 7584 0.0 0.0 0.0
2002 8320 0.0 0.0 0.0
2003 7969 0.0 0.0 0.0
2004 8600 0.0 0.0 0.0
2005 8687 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8039 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8423 0.0 0.0 0.0
2014 8287 0.0 0.0 0.0
2015 4343 0.0 0.0 0.0

For data sources see[5]

References