X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394102901B00

Well Details

Well ID: 0394102901B00
Loading map...
Location: B0/01-29-039-10W4/0
Location Alias: B0/01-29-39-10 W4M
Location Alias 2: B0/01-29-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 29
County/Municipality: County of Paintearth No. 18
Well Name: CPEC PROVOST 1-29-39-10
Operator Name: Crescent Point Energy Corp.
License Number: 0150465
License Date: 1991-10-28
License Status: RecCertified
Spud Date: 1991-11-01
Final Drill Date: 1991-11-05
Well Total Depth: 1025.00 m
Surface Hole Latitude: 52.377394
Surface Hole Longitude: -111.401615

For data sources see[1][2]

Well History

Date Event
1991-10-28 Obtained License
1991-11-02 Surface Casing Operation Performed
1991-11-05 Finished Drilling
1991-11-05 Well Log Performed
1991-11-06 Plug Back Performed
1991-11-07 Drill Stem Test Performed
1991-11-09 Production Casing Operation Performed
1991-11-09 Rig Released
1991-11-14 Well Log Performed
1991-11-15 Perforation Treatment Performed - Jet Perforation
1991-11-15 Well Mode changed to Drilled and Cased
1991-12-01 Well Began Production
1991-12-01 Well Fluid changed to Crude Oil
1991-12-01 Well Mode changed to Pumping
1992-01-07 Well Log Performed
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Suspended
2008-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-28 Perforation Treatment Performed - Jet Perforation
2008-09-28 Plug Back Performed
2008-09-28 Well Fluid changed to Crude Oil
2008-09-28 Well Mode changed to Abandoned Zone
2008-10-01 Perforation Treatment Performed - Cement Squeeze
2008-10-01 Plug Back Performed
2008-10-06 Well Abandoned
2008-10-06 Well Fluid changed to Crude Oil
2008-10-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-11-15 Perforation 946.00 948.00 13
2008-09-28 Packing Device Capped w/Cement 934.00 942.00 0
2008-09-28 Perforation 290.00 291.00 13
2008-10-01 Cement Squeeze 290.00 291.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 735 0.0 0.0 0.0
1992 1358 0.0 0.0 0.0

For data sources see[5]

References