X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394050107B00

Well Details

Well ID: 0394050107B00
Loading map...
Location: B0/07-01-039-05W4/0
Location Alias: B0/07-01-39-05 W4M
Location Alias 2: B0/07-01-039-05 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 05
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: ZAPATA PROVO 7-1-39-5
Operator Name: Surge Energy Inc.
License Number: 0134631
License Date: 1988-06-28
License Status: Abandoned
Spud Date: 1988-07-03
Final Drill Date: 1988-07-05
Well Total Depth: 912.00 m
Surface Hole Latitude: 52.321722
Surface Hole Longitude: -110.591097

For data sources see[1][2]

Well History

Date Event
1988-06-28 Obtained License
1988-07-04 Surface Casing Operation Performed
1988-07-05 Finished Drilling
1988-07-05 Well Mode changed to Drilled and Cased
1988-07-06 Production Casing Operation Performed
1988-07-06 Rig Released
1988-07-06 Well Log Performed
1988-07-08 Well Log Performed
1988-07-09 Perforation Treatment Performed - Jet Perforation
1988-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-01 Well Began Injection
1988-09-01 Well Fluid changed to Water
1988-09-01 Well Type changed to Disposal
2000-01-12 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-01-31 Perforation Treatment Performed - Jet Perforation
2000-10-01 Well Fluid changed to Water
2000-10-01 Well Mode changed to Suspended
2000-10-01 Well Type changed to Disposal
2010-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-28 Plug Back Performed
2010-12-28 Well Fluid changed to Water
2010-12-28 Well Mode changed to Abandoned Zone
2010-12-28 Well Type changed to Disposal
2018-10-26 Well Abandoned
2018-10-26 Well Fluid changed to Water
2018-10-26 Well Mode changed to Abandoned
2018-10-26 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-09 Perforation 889.00 893.00 13
1988-07-23 Acid Treatment 889.00 893.00 0
2000-01-12 Bridge Plug, No Cement 875.00 875.30 0
2000-01-31 Perforation 855.00 860.00 14
2010-12-28 Packing Device Capped w/Cement 839.60 847.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References