X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394050106A00

Well Details

Well ID: 0394050106A00
Loading map...
Location: A0/06-01-039-05W4/0
Location Alias: A0/06-01-39-05 W4M
Location Alias 2: A0/06-01-039-05 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 05
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: ZAPATA PROVO 6-1-39-5
Operator Name: Surge Energy Inc.
License Number: 0170906
License Date: 1994-09-29
License Status: Abandoned
Spud Date: 1994-10-25
Final Drill Date: 1994-10-28
Well Total Depth: 933.00 m
Surface Hole Latitude: 52.322185
Surface Hole Longitude: -110.596778

For data sources see[1][2]

Well History

Date Event
1994-09-29 Obtained License
1994-10-26 Surface Casing Operation Performed
1994-10-27 Direction Drilling Operation Performed - Deviate
1994-10-28 Finished Drilling
1994-10-28 Well Mode changed to Drilled and Cased
1994-10-29 Production Casing Operation Performed
1994-10-29 Rig Released
1994-10-29 Well Log Performed
1994-11-01 Perforation Treatment Performed - Jet Perforation
1994-11-02 Well Began Production
1994-11-02 Well Fluid changed to Crude Oil
1994-11-02 Well Mode changed to Pumping
1994-12-05 Well Log Performed
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
1999-01-25 Perforation Treatment Performed - Jet Perforation
1999-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-26 Plug Back Performed
1999-01-27 Well Abandoned
1999-01-27 Well Fluid changed to Crude Oil
1999-01-27 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-10-27 281.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-01 Perforation 862.00 864.00 13
1999-01-25 Perforation 857.00 859.00 13
1999-01-26 Packing Device Capped w/Cement 844.50 852.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1404 0.0 0.0 0.0
1995 8716 0.0 0.0 0.0
1996 8725 0.0 0.0 0.0
1997 8588 0.0 0.0 0.0
1998 3576 0.0 0.0 0.0

For data sources see[6]

References