If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394041201002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.333833,"lon":-110.441653,"icon":""}]} |
Location: 00/01-12-039-04W4/2 | |
Location Alias: 00/01-12-39-04 W4M | |
Location Alias 2: 00/01-12-039-04 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 04 | |
Section: 12 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 1-12-39-4 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0128111 | |
License Date: 1987-08-25 | |
License Status: Issued | |
Spud Date: 1987-09-02 | |
Final Drill Date: 1987-09-05 | |
Well Total Depth: 873.00 m | |
Surface Hole Latitude: 52.333833 | |
Surface Hole Longitude: -110.441653 |
Date | Event |
---|---|
1987-08-25 | Obtained License |
1987-09-03 | Surface Casing Operation Performed |
1987-09-05 | Finished Drilling |
1987-09-05 | Lost Circulation Occurred |
1987-09-05 | Well Log Performed |
1987-09-05 | Well Mode changed to Drilled and Cased |
1987-09-06 | Plug Back Performed |
1987-09-07 | Production Casing Operation Performed |
1987-09-07 | Rig Released |
1987-09-14 | Well Log Performed |
1987-09-16 | Perforation Treatment Performed - Jet Perforation |
1987-09-16 | Well Log Performed |
1987-12-22 | Well Log Performed |
1988-04-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-04-04 | Plug Back Performed |
1988-04-05 | Perforation Treatment Performed - Jet Perforation |
1988-04-05 | Well Log Performed |
1988-04-07 | Well Began Production |
1988-04-07 | Well Fluid changed to Crude Oil |
1988-04-07 | Well Mode changed to Pumping |
1988-10-25 | Well Fluid changed to Crude Oil |
1988-10-25 | Well Mode changed to Suspended |
1989-05-15 | Well Fluid changed to Crude Oil |
1989-05-15 | Well Mode changed to Pumping |
1989-07-24 | Well Fluid changed to Crude Oil |
1989-07-24 | Well Mode changed to Suspended |
2004-12-13 | Perforation Treatment Performed - Jet Perforation |
2004-12-13 | Well Log Performed |
2005-03-11 | Well Fluid changed to Crude Oil |
2005-03-11 | Well Mode changed to Flowing |
2005-11-18 | Perforation Treatment Performed - Cement Squeeze |
2005-11-18 | Plug Back Performed |
2005-11-18 | Well Fluid changed to Crude Oil |
2005-11-18 | Well Mode changed to Abandoned Zone |
2005-11-25 | Perforation Treatment Performed - Jet Perforation |
2005-11-25 | Well Log Performed |
2008-06-05 | Perforation Treatment Performed - Jet Perforation |
2008-06-07 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-09-16 | Perforation | 786.00 | 790.00 | 13 |
1988-04-04 | Packing Device Capped w/Cement | 772.00 | 780.50 | 0 |
1988-04-05 | Perforation | 692.50 | 694.00 | 13 |
2004-12-13 | Perforation | 691.00 | 694.00 | 20 |
2005-11-18 | Cement Squeeze | 691.00 | 694.00 | 0 |
2005-11-25 | Perforation | 746.50 | 749.00 | 17 |
2005-11-25 | Perforation | 751.00 | 754.00 | 17 |
2008-06-05 | Perforation | 755.00 | 759.50 | 17 |
2008-06-07 | Fracture | 746.50 | 759.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 3154 | 0.0 | 0.0 | 0.0 |
1989 | 1645 | 0.0 | 0.0 | 0.0 |
2005 | 2353 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1987-09-05 | Lost Circulation | 873.00 | 873.00 |
For data sources see[6]