X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394040309030

Well Details

Well ID: 0394040309030
Loading map...
Location: 03/09-03-039-04W4/0
Location Alias: 03/09-03-39-04 W4M
Location Alias 2: 03/09-03-039-04 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 04
Section: 03
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 9-3-39-4
Operator Name: Bow River Energy Ltd.
License Number: 0203404
License Date: 1997-07-14
License Status: Suspension
Spud Date: 1997-07-14
Final Drill Date: 1997-07-16
Well Total Depth: 835.00 m
Surface Hole Latitude: 52.326848
Surface Hole Longitude: -110.485586

For data sources see[1][2]

Well History

Date Event
1997-07-14 Obtained License
1997-07-15 Direction Drilling Operation Performed - Deviate
1997-07-15 Surface Casing Operation Performed
1997-07-16 Finished Drilling
1997-07-16 Well Mode changed to Drilled and Cased
1997-07-17 Production Casing Operation Performed
1997-07-17 Rig Released
1997-07-17 Well Log Performed
1997-07-27 Well Log Performed
1997-07-28 Perforation Treatment Performed - Jet Perforation
1997-07-31 Well Log Performed
1997-08-01 Perforation Treatment Performed - Jet Perforation
1997-08-01 Perforation Treatment Performed - Remedial Casing
1997-08-03 Perforation Treatment Performed - Jet Perforation
1997-08-03 Well Log Performed
1997-08-04 Perforation Treatment Performed - Cement Squeeze
1997-08-06 Perforation Treatment Performed - Jet Perforation
1997-08-06 Well Log Performed
1997-08-07 Perforation Treatment Performed - Acid Wash - No Pressure
1997-08-10 Well Began Production
1997-08-10 Well Fluid changed to Crude Oil
1997-08-10 Well Mode changed to Pumping
1997-08-13 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-15 224.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-28 Perforation 805.50 806.50 14
1997-08-01 Perforation 819.50 819.80 36
1997-08-01 Remedial Casing Cementing 819.50 819.80 0
1997-08-03 Perforation 805.50 806.50 14
1997-08-04 Cement Squeeze 805.50 806.50 0
1997-08-06 Perforation 805.50 806.50 14
1997-08-07 Acid Wash 805.50 806.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3415 0.0 0.0 0.0
1998 8612 0.0 0.0 0.0
1999 8704 0.0 0.0 0.0
2000 8503 0.0 0.0 0.0
2001 8461 0.0 0.0 0.0
2002 8459 0.0 0.0 0.0
2003 8613 0.0 0.0 0.0
2004 8456 0.0 0.0 0.0
2005 8392 0.0 0.0 0.0
2006 8370 0.0 0.0 0.0
2007 7058 0.0 0.0 0.0
2008 8107 0.0 0.0 0.0
2009 8657 0.0 0.0 0.0
2010 1560 0.0 0.0 0.0
2011 5146 0.0 0.0 0.0
2012 8155 0.0 0.0 0.0
2013 6649 0.0 0.0 0.0
2014 8471 0.0 0.0 0.0
2015 1753 0.0 0.0 0.0
2016 2112 0.0 0.0 0.0

For data sources see[6]

References