X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394033514000

Well Details

Well ID: 0394033514000
Loading map...
Location: 00/14-35-039-03W4/0
Location Alias: 00/14-35-39-03 W4M
Location Alias 2: 00/14-35-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 35
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC PROVOST 14-35-39-3
Operator Name: West Lake Energy Corp.
License Number: 0269488
License Date: 2002-04-23
License Status: Suspension
Spud Date: 2002-07-05
Final Drill Date: 2002-07-07
Well Total Depth: 893.00 m
Surface Hole Latitude: 52.404236
Surface Hole Longitude: -110.333654

For data sources see[1][2]

Well History

Date Event
2002-04-23 Obtained License
2002-07-05 Surface Casing Operation Performed
2002-07-05 Well Log Performed
2002-07-07 Finished Drilling
2002-07-07 Production Casing Operation Performed
2002-07-07 Rig Released
2002-07-07 Well Log Performed
2002-07-07 Well Mode changed to Drilled and Cased
2002-07-20 Perforation Treatment Performed - Jet Perforation
2002-07-23 Well Log Performed
2002-08-23 Well Began Production
2002-08-23 Well Fluid changed to Crude Oil
2002-08-23 Well Mode changed to Pumping
2002-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-22 Plug Back Performed
2002-09-22 Well Fluid changed to Crude Oil
2002-09-22 Well Mode changed to Abandoned Zone
2002-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-16 Perforation Treatment Performed - Jet Perforation
2002-10-16 Plug Back Performed
2002-10-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-20 Perforation 834.00 836.50 17
2002-09-22 Packing Device Capped w/Cement 817.80 825.80 0
2002-10-16 Perforation 834.00 836.50 17
2002-10-16 Packing Device Capped w/Cement 830.00 833.00 0
2002-10-16 Perforation 823.20 825.20 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 708 0.0 0.0 0.0

For data sources see[5]

References