X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031407000

Well Details

Well ID: 0394031407000
Loading map...
Location: 00/07-14-039-03W4/0
Location Alias: 00/07-14-39-03 W4M
Location Alias 2: 00/07-14-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE COHO PROVOST 7-14-39-3
Operator Name: Enerplus Corporation
License Number: 0135810
License Date: 1988-08-25
License Status: Issued
Spud Date: 1988-09-03
Final Drill Date: 1988-09-06
Well Total Depth: 825.00 m
Surface Hole Latitude: 52.353328
Surface Hole Longitude: -110.328020

For data sources see[1][2]

Well History

Date Event
1988-08-25 Obtained License
1988-09-04 Surface Casing Operation Performed
1988-09-06 Finished Drilling
1988-09-07 Production Casing Operation Performed
1988-09-07 Rig Released
1988-09-07 Well Log Performed
1988-09-07 Well Mode changed to Drilled and Cased
1988-09-15 Well Log Performed
1988-09-18 Perforation Treatment Performed - Jet Perforation
1988-09-20 Perforation Treatment Performed - Cement Squeeze
1988-09-23 Well Log Performed
1988-09-24 Perforation Treatment Performed - Jet Perforation
1988-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-28 Plug Back Performed
1988-09-28 Well Log Performed
1988-09-29 Perforation Treatment Performed - Fractured
1988-10-09 Well Began Production
1988-10-09 Well Fluid changed to Crude Oil
1988-10-09 Well Mode changed to Pumping
1995-02-24 Perforation Treatment Performed - Cement Squeeze
1995-02-24 Plug Back Performed
1995-02-24 Well Fluid changed to Crude Oil
1995-02-24 Well Mode changed to Abandoned Zone
1995-03-03 Perforation Treatment Performed - Jet Perforation
1995-03-04 Well Log Performed
1995-03-05 Perforation Treatment Performed - Jet Perforation
1997-06-26 Well Log Performed
2004-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-20 Perforation Treatment Performed - Jet Perforation
2004-06-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-18 Perforation 771.00 775.00 13
1995-03-05 Perforation 776.00 777.00 13
2004-06-20 Packing Device Capped w/Cement 757.00 765.00 0
2004-06-20 Perforation 738.50 743.00 20
2004-06-23 Fracture 738.50 743.00 0
1988-09-20 Cement Squeeze 771.00 775.00 0
1988-09-24 Perforation 770.00 772.00 13
1988-09-24 Perforation 772.00 775.00 13
1988-09-28 Packing Device Capped w/Cement 757.00 765.00 0
1988-09-28 Perforation 738.50 741.00 13
1988-09-29 Fracture 738.50 741.00 0
1995-02-24 Cement Squeeze 738.50 741.00 0
1995-03-03 Perforation 770.00 775.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1770 0.0 0.0 0.0
1989 8596 0.0 0.0 0.0
1990 8743 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8393 0.0 0.0 0.0
1994 6630 0.0 0.0 0.0

For data sources see[5]

References