X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031311003

Well Details

Well ID: 0394031311003
Loading map...
Location: 00/11-13-039-03W4/3
Location Alias: 00/11-13-39-03 W4M
Location Alias 2: 00/11-13-039-03 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE PROVOST 11-13-39-3
Operator Name: Enerplus Corporation
License Number: 0151693
License Date: 1992-02-12
License Status: Issued
Spud Date: 1992-02-21
Final Drill Date: 1992-02-23
Well Total Depth: 869.00 m
Surface Hole Latitude: 52.355516
Surface Hole Longitude: -110.304960

For data sources see[1][2]

Well History

Date Event
1992-02-12 Obtained License
1992-02-22 Surface Casing Operation Performed
1992-02-23 Finished Drilling
1992-02-23 Well Log Performed
1992-02-23 Well Mode changed to Drilled and Cased
1992-02-24 Production Casing Operation Performed
1992-02-24 Rig Released
1992-02-28 Perforation Treatment Performed - Jet Perforation
1992-11-28 Perforation Treatment Performed - Jet Perforation
1992-11-29 Perforation Treatment Performed - Fractured
1996-08-15 Well Log Performed
1996-08-16 Perforation Treatment Performed - Jet Perforation
1996-08-17 Perforation Treatment Performed - Jet Perforation
1996-08-17 Well Log Performed
1996-08-23 Perforation Treatment Performed - Fractured
1996-08-25 Well Began Production
1996-08-25 Well Fluid changed to Crude Oil
1996-08-25 Well Mode changed to Pumping
1997-06-29 Perforation Treatment Performed - Cement Squeeze
1997-06-29 Plug Back Performed
1997-06-29 Well Fluid changed to Crude Oil
1997-06-29 Well Mode changed to Abandoned Zone
2004-07-19 Perforation Treatment Performed - Jet Perforation
2004-08-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-28 Perforation 792.50 793.50 13
1997-06-29 Cement Squeeze 733.00 752.00 0
2004-07-19 Perforation 748.00 760.00 17
2004-08-27 Fracture 748.00 760.00 0
1992-11-28 Perforation 779.00 780.00 13
1992-11-28 Perforation 781.50 784.00 13
1992-11-29 Fracture 779.00 784.00 0
1996-08-16 Perforation 733.00 735.00 13
1996-08-16 Perforation 738.20 740.20 13
1996-08-16 Perforation 747.00 750.00 13
1996-08-17 Perforation 750.00 752.00 13
1996-08-23 Fracture 733.00 740.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3009 0.0 0.0 0.0
1997 4245 0.0 0.0 0.0

For data sources see[5]

References