X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031307020

Well Details

Well ID: 0394031307020
Loading map...
Location: 02/07-13-039-03W4/0
Location Alias: 02/07-13-39-03 W4M
Location Alias 2: 02/07-13-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE 7B PROVOST 7-13-39-3
Operator Name: Enerplus Corporation
License Number: 0188648
License Date: 1996-06-13
License Status: Issued
Spud Date: 1996-07-05
Final Drill Date: 1996-07-07
Well Total Depth: 810.00 m
Surface Hole Latitude: 52.350369
Surface Hole Longitude: -110.302077

For data sources see[1][2]

Well History

Date Event
1996-06-13 Obtained License
1996-07-06 Surface Casing Operation Performed
1996-07-07 Finished Drilling
1996-07-07 Well Log Performed
1996-07-07 Well Mode changed to Drilled and Cased
1996-07-08 Production Casing Operation Performed
1996-07-08 Rig Released
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Well Log Performed
1996-08-17 Perforation Treatment Performed - Fractured
1996-08-27 Well Began Production
1996-08-27 Well Fluid changed to Crude Oil
1996-08-27 Well Mode changed to Pumping
1996-11-03 Perforation Treatment Performed - Fractured
1996-11-16 Well Log Performed
1996-12-03 Well Began Injection
1996-12-03 Well Fluid changed to Water
1996-12-03 Well Type changed to Injection
2010-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-04 Perforation Treatment Performed - Jet Perforation
2010-11-04 Plug Back Performed
2010-11-04 Well Fluid changed to Water
2010-11-04 Well Log Performed
2010-11-04 Well Mode changed to Abandoned Zone
2010-11-04 Well Type changed to Injection
2010-11-05 Well Log Performed
2011-09-20 Perforation Treatment Performed - Jet Perforation
2011-09-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-14 Perforation 775.50 777.50 26
1996-08-17 Fracture 775.50 777.50 0
1996-11-03 Fracture 775.50 777.50 0
2010-11-04 Packing Device Capped w/Cement 765.00 773.00 0
2010-11-04 Perforation 729.50 731.50 20
2011-09-20 Perforation 729.50 731.50 20
2011-09-22 Fracture 729.50 731.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 459 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0

For data sources see[5]

References