X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394030712000

Well Details

Well ID: 0394030712000
Loading map...
Location: 00/12-07-039-03W4/0
Location Alias: 00/12-07-39-03 W4M
Location Alias 2: 00/12-07-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 07
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 12-7-39-3
Operator Name: Bow River Energy Ltd.
License Number: 0153056
License Date: 1992-07-15
License Status: Issued
Spud Date: 1992-07-15
Final Drill Date: 1992-07-17
Well Total Depth: 857.00 m
Surface Hole Latitude: 52.341467
Surface Hole Longitude: -110.433205

For data sources see[1][2]

Well History

Date Event
1992-07-15 Obtained License
1992-07-15 Well Log Performed
1992-07-16 Direction Drilling Operation Performed - Deviate
1992-07-16 Surface Casing Operation Performed
1992-07-17 Finished Drilling
1992-07-17 Well Log Performed
1992-07-17 Well Mode changed to Drilled and Cased
1992-07-18 Production Casing Operation Performed
1992-07-18 Rig Released
1992-07-20 Perforation Treatment Performed - Jet Perforation
1992-07-21 Perforation Treatment Performed - Jet Perforation
1992-07-29 Well Log Performed
1992-08-13 Well Began Production
1992-08-13 Well Fluid changed to Crude Oil
1992-08-13 Well Mode changed to Pumping
2001-08-03 Perforation Treatment Performed - Cement Squeeze
2001-08-08 Perforation Treatment Performed - Jet Perforation
2001-08-08 Well Log Performed
2001-08-13 Well Log Performed
2002-03-12 Well Began Injection
2002-03-12 Well Fluid changed to Water
2002-03-12 Well Type changed to Injection
2016-04-01 Well Fluid changed to Water
2016-04-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-07-16 253.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-20 Perforation 797.50 800.70 13
1992-07-21 Perforation 797.50 803.00 13
2001-08-03 Cement Squeeze 797.50 803.00 0
2001-08-08 Perforation 818.00 824.00 13
2001-08-08 Perforation 824.00 830.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3356 0.0 0.0 0.0
1993 6816 0.0 0.0 0.0
1994 4636 0.0 0.0 0.0
1995 7957 0.0 0.0 0.0
1996 8108 0.0 0.0 0.0
1997 7657 0.0 0.0 0.0
1998 8047 0.0 0.0 0.0
1999 5389 0.0 0.0 0.0
2000 5725 0.0 0.0 0.0
2001 863 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-29 No Incident Encountered 0.00 0.00
2012-09-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References