X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394030611022

Well Details

Well ID: 0394030611022
Loading map...
Location: 02/11-06-039-03W4/2
Location Alias: 02/11-06-39-03 W4M
Location Alias 2: 02/11-06-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 06
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 11-6-39-3
Operator Name: Bow River Energy Ltd.
License Number: 0152963
License Date: 1992-07-03
License Status: Issued
Spud Date: 1992-07-04
Final Drill Date: 1992-07-07
Well Total Depth: 945.00 m
Surface Hole Latitude: 52.328762
Surface Hole Longitude: -110.426236

For data sources see[1][2]

Well History

Date Event
1992-07-03 Obtained License
1992-07-05 Direction Drilling Operation Performed - Deviate
1992-07-05 Surface Casing Operation Performed
1992-07-07 Finished Drilling
1992-07-07 Well Log Performed
1992-07-07 Well Mode changed to Drilled and Cased
1992-07-08 Production Casing Operation Performed
1992-07-08 Rig Released
1992-07-08 Well Log Performed
1992-07-16 Perforation Treatment Performed - Jet Perforation
1992-07-16 Well Log Performed
1992-07-17 Perforation Treatment Performed - Jet Perforation
1992-07-17 Well Log Performed
1995-07-31 Perforation Treatment Performed - Cement Squeeze
1995-07-31 Plug Back Performed
1995-08-04 Well Log Performed
1995-08-07 Perforation Treatment Performed - Jet Perforation
1995-08-08 Well Log Performed
1995-08-10 Well Log Performed
1995-08-15 Well Log Performed
1995-08-17 Well Began Injection
1995-08-17 Well Fluid changed to Water
1995-08-17 Well Type changed to Disposal
2005-07-06 Well Log Performed
2005-09-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-07-05 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-16 Perforation 837.80 839.00 13
1992-07-17 Perforation 844.80 847.80 13
1995-07-31 Cement Squeeze 837.80 847.80 0
1995-08-07 Perforation 870.00 875.00 18
2005-09-09 Perforation 882.00 897.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References