X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394023011002

Well Details

Well ID: 0394023011002
Loading map...
Location: 00/11-30-039-02W4/2
Location Alias: 00/11-30-39-02 W4M
Location Alias 2: 00/11-30-039-02 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 11-30-39-2
Operator Name: Surge Energy Inc.
License Number: 0143979
License Date: 1990-04-23
License Status: Issued
Spud Date: 1990-05-02
Final Drill Date: 1990-05-04
Well Total Depth: 870.00 m
Surface Hole Latitude: 52.386154
Surface Hole Longitude: -110.285917

For data sources see[1][2]

Well History

Date Event
1990-04-23 Obtained License
1990-05-02 Surface Casing Operation Performed
1990-05-04 Finished Drilling
1990-05-04 Well Mode changed to Drilled and Cased
1990-05-05 Drill Stem Test Performed
1990-05-05 Well Log Performed
1990-05-06 Production Casing Operation Performed
1990-05-06 Rig Released
1990-05-09 Perforation Treatment Performed - Jet Perforation
1995-05-12 Perforation Treatment Performed - Jet Perforation
1995-05-13 Perforation Treatment Performed - Cement Squeeze
1995-05-13 Plug Back Performed
1995-05-15 Perforation Treatment Performed - Jet Perforation
1999-05-29 Perforation Treatment Performed - Cement Squeeze
1999-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-01 Perforation Treatment Performed - Jet Perforation
1999-06-01 Plug Back Performed
1999-06-02 Perforation Treatment Performed - Fractured
1999-06-07 Well Began Production
1999-06-07 Well Fluid changed to Crude Oil
1999-06-07 Well Mode changed to Pumping
1999-06-08 Well Fluid changed to Crude Oil
1999-06-08 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-05-09 Perforation 782.00 784.00 13
1995-05-12 Perforation 787.50 788.50 13
1995-05-13 Cement Squeeze 782.00 788.50 0
1995-05-15 Perforation 782.00 783.00 13
1999-05-29 Cement Squeeze 782.00 783.00 0
1999-06-01 Perforation 788.00 789.00 13
1999-06-01 Packing Device Capped w/Cement 772.00 780.00 0
1999-06-01 Perforation 754.50 755.50 13
1999-06-02 Fracture 754.50 755.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4951 0.0 0.0 0.0
2000 8672 0.0 0.0 0.0
2001 8717 0.0 0.0 0.0
2002 8722 0.0 0.0 0.0
2003 8753 0.0 0.0 0.0
2004 8676 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 8543 0.0 0.0 0.0
2007 7547 0.0 0.0 0.0
2008 8597 0.0 0.0 0.0
2009 8723 0.0 0.0 0.0
2010 7691 0.0 0.0 0.0
2011 8736 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8563 0.0 0.0 0.0
2014 8518 0.0 0.0 0.0
2015 7581 0.0 0.0 0.0
2016 8753 0.0 0.0 0.0
2017 7819 0.0 0.0 0.0
2018 8350 0.0 0.0 0.0
2019 4340 0.0 0.0 0.0

For data sources see[5]

References