X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394023004D00

Well Details

Well ID: 0394023004D00
Loading map...
Location: D0/04-30-039-02W4/0
Location Alias: D0/04-30-39-02 W4M
Location Alias 2: D0/04-30-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: RENAISSANCE 4D PROVOST 4-30-39-2
Operator Name: Husky Oil Operations Limited
License Number: 0190242
License Date: 1996-08-07
License Status: RecCertified
Spud Date: 1996-08-26
Final Drill Date: 1996-08-29
Well Total Depth: 884.00 m
Surface Hole Latitude: 52.376558
Surface Hole Longitude: -110.287797

For data sources see[1][2]

Well History

Date Event
1996-08-07 Obtained License
1996-08-27 Direction Drilling Operation Performed - Deviate
1996-08-27 Surface Casing Operation Performed
1996-08-29 Finished Drilling
1996-08-29 Production Casing Operation Performed
1996-08-29 Rig Released
1996-08-29 Well Log Performed
1996-08-29 Well Mode changed to Drilled and Cased
1996-09-04 Perforation Treatment Performed - Jet Perforation
1996-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-05 Perforation Treatment Performed - Jet Perforation
1996-09-05 Plug Back Performed
1996-09-09 Well Began Production
1996-09-09 Well Fluid changed to Crude Oil
1996-09-09 Well Mode changed to Pumping
1996-09-26 Well Log Performed
1999-05-31 Well Fluid changed to Crude Oil
1999-05-31 Well Mode changed to Suspended
2005-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-31 Plug Back Performed
2005-05-31 Well Fluid changed to Crude Oil
2005-05-31 Well Mode changed to Abandoned Zone
2007-04-18 Well Abandoned
2007-04-18 Well Fluid changed to Crude Oil
2007-04-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-27 207.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-04 Perforation 835.00 837.00 13
1996-09-05 Packing Device Capped w/Cement 820.50 828.50 0
1996-09-05 Perforation 810.00 811.50 13
2005-05-31 Packing Device Capped w/Cement 787.00 795.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2691 0.0 0.0 0.0
1997 8541 0.0 0.0 0.0
1998 8580 0.0 0.0 0.0
1999 1869 0.0 0.0 0.0

For data sources see[6]

References