X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394023004B00

Well Details

Well ID: 0394023004B00
Loading map...
Location: B0/04-30-039-02W4/0
Location Alias: B0/04-30-39-02 W4M
Location Alias 2: B0/04-30-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 4-30-39-2
Operator Name: Surge Energy Inc.
License Number: 0153712
License Date: 1992-09-15
License Status: Abandoned
Spud Date: 1992-09-21
Final Drill Date: 1992-09-23
Well Total Depth: 869.00 m
Surface Hole Latitude: 52.377015
Surface Hole Longitude: -110.290696

For data sources see[1][2]

Well History

Date Event
1992-09-15 Obtained License
1992-09-21 Lost Circulation Occurred
1992-09-22 Surface Casing Operation Performed
1992-09-23 Finished Drilling
1992-09-23 Well Mode changed to Drilled and Cased
1992-09-24 Production Casing Operation Performed
1992-09-24 Rig Released
1992-09-24 Well Log Performed
1992-09-28 Perforation Treatment Performed - Jet Perforation
1992-10-03 Well Began Production
1992-10-03 Well Fluid changed to Crude Oil
1992-10-03 Well Mode changed to Pumping
1996-02-11 Perforation Treatment Performed - Jet Perforation
2001-07-01 Well Fluid changed to Crude Oil
2001-07-01 Well Mode changed to Suspended
2004-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-10 Plug Back Performed
2004-08-10 Well Fluid changed to Crude Oil
2004-08-10 Well Mode changed to Abandoned Zone
2007-04-18 Well Abandoned
2007-04-18 Well Fluid changed to Crude Oil
2007-04-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-28 Perforation 793.50 795.00 13
1996-02-11 Perforation 793.00 795.00 13
2004-08-10 Packing Device Capped w/Cement 779.00 787.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1820 0.0 0.0 0.0
1993 8367 0.0 0.0 0.0
1994 8584 0.0 0.0 0.0
1995 8616 0.0 0.0 0.0
1996 8578 0.0 0.0 0.0
1997 8573 0.0 0.0 0.0
1998 8716 0.0 0.0 0.0
1999 8471 0.0 0.0 0.0
2000 8585 0.0 0.0 0.0
2001 4168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-09-21 Lost Circulation 7.00 30.00

For data sources see[6]

References