If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394022801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.379226,"lon":-110.226348,"icon":""}]} |
Location: 00/01-28-039-02W4/0 | |
Location Alias: 00/01-28-39-02 W4M | |
Location Alias 2: 00/01-28-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 28 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BLAKE ET AL GILLESPIE 1-28-39-2 | |
Operator Name: Woodbend Oil & Gas Ltd. | |
License Number: 0093171 | |
License Date: 1981-11-09 | |
License Status: RecCertified | |
Spud Date: 1981-11-09 | |
Final Drill Date: 1981-11-12 | |
Well Total Depth: 870.00 m | |
Surface Hole Latitude: 52.379226 | |
Surface Hole Longitude: -110.226348 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-11-09 | Obtained License |
1981-11-12 | Finished Drilling |
1981-11-13 | Drill Stem Test Performed |
1981-11-13 | Well Log Performed |
1981-11-14 | Production Casing Operation Performed |
1981-11-24 | Perforation Treatment Performed - Jet Perforation |
1981-12-15 | Well Mode changed to Drilled and Cased |
1982-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-12-18 | Well Began Production |
1982-12-18 | Well Fluid changed to Crude Oil |
1982-12-18 | Well Mode changed to Flowing |
1988-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-14 | Plug Back Performed |
1988-06-14 | Well Fluid changed to Crude Oil |
1988-06-14 | Well Mode changed to Abandoned |
1991-05-19 | Perforation Treatment Performed - Jet Perforation |
1991-05-19 | Well Log Performed |
1991-05-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1991-05-21 | Perforation Treatment Performed - Remedial Casing |
1991-06-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-11-24 | Perforation | 722.50 | 725.50 | 7 |
1982-12-16 | Acid Treatment | 722.50 | 725.50 | 0 |
1988-06-14 | Packing Device Capped w/Cement | 712.00 | 720.00 | 0 |
1991-05-19 | Perforation | 175.00 | 176.00 | 13 |
1991-05-21 | Acid Wash | 175.00 | 176.00 | 0 |
1991-05-21 | Remedial Casing Cementing | 175.00 | 176.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 156 | 0.0 | 0.0 | 0.0 |
1983 | 75 | 0.0 | 0.0 | 0.0 |
For data sources see[5]