X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394022304000

Well Details

Well ID: 0394022304000
Loading map...
Location: 00/04-23-039-02W4/0
Location Alias: 00/04-23-39-02 W4M
Location Alias 2: 00/04-23-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 23
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC PROVOST 4-23-39-2
Operator Name: West Lake Energy Corp.
License Number: 0172608
License Date: 1994-11-16
License Status: Abandoned
Spud Date: 1994-12-01
Final Drill Date: 1994-12-04
Well Total Depth: 967.00 m
Surface Hole Latitude: 52.358262
Surface Hole Longitude: -110.198215

For data sources see[1][2]

Well History

Date Event
1994-11-16 Obtained License
1994-12-01 Direction Drilling Operation Performed - Deviate
1994-12-02 Surface Casing Operation Performed
1994-12-04 Finished Drilling
1994-12-04 Well Log Performed
1994-12-04 Well Mode changed to Drilled and Cased
1994-12-05 Production Casing Operation Performed
1994-12-05 Rig Released
1995-01-17 Well Log Performed
1995-02-19 Perforation Treatment Performed - Jet Perforation
1995-02-19 Well Log Performed
1995-04-12 Well Began Production
1995-04-12 Well Fluid changed to Crude Oil
1995-04-12 Well Mode changed to Pumping
1995-06-16 Perforation Treatment Performed - Jet Perforation
1995-06-16 Well Log Performed
1996-01-20 Well Fluid changed to Crude Oil
1996-01-20 Well Mode changed to Suspended
2002-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-19 Plug Back Performed
2002-09-19 Well Fluid changed to Crude Oil
2002-09-19 Well Log Performed
2002-09-19 Well Mode changed to Abandoned Zone
2002-09-25 Well Abandoned
2002-09-25 Well Fluid changed to Crude Oil
2002-09-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-12-01 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-19 Perforation 927.00 930.00 17
1995-06-16 Perforation 930.00 933.00 17
1995-06-16 Perforation 930.00 933.00 17
2002-09-19 Packing Device Capped w/Cement 910.00 918.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4834 0.0 0.0 0.0
1996 476 0.0 0.0 0.0

For data sources see[6]

References