X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394021904022

Well Details

Well ID: 0394021904022
Loading map...
Location: 02/04-19-039-02W4/2
Location Alias: 02/04-19-39-02 W4M
Location Alias 2: 02/04-19-039-02 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 19
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 4-19-39-2
Operator Name: Surge Energy Inc.
License Number: 0190241
License Date: 1996-08-07
License Status: Suspension
Spud Date: 1996-09-23
Final Drill Date: 1996-09-25
Well Total Depth: 859.00 m
Surface Hole Latitude: 52.362493
Surface Hole Longitude: -110.290262

For data sources see[1][2]

Well History

Date Event
1996-08-07 Obtained License
1996-09-24 Direction Drilling Operation Performed - Deviate
1996-09-25 Finished Drilling
1996-09-25 Well Log Performed
1996-09-25 Well Mode changed to Drilled and Cased
1996-09-26 Production Casing Operation Performed
1996-09-26 Rig Released
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-29 Well Log Performed
1996-10-11 Well Began Production
1996-10-11 Well Fluid changed to Crude Oil
1996-10-11 Well Mode changed to Pumping
1999-04-30 Well Fluid changed to Crude Oil
1999-04-30 Well Mode changed to Suspended
1999-10-31 Well Log Performed
1999-11-26 Well Began Injection
1999-11-26 Well Fluid changed to Water
1999-11-26 Well Type changed to Injection
2011-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-25 Well Fluid changed to Water
2011-09-25 Well Mode changed to Suspended
2011-09-25 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-24 236.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-29 Perforation 781.00 783.00 13
2011-09-25 Packing Device Capped w/Cement 765.30 773.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1936 0.0 0.0 0.0
1997 8631 0.0 0.0 0.0
1998 8618 0.0 0.0 0.0
1999 860 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[6]

References