If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394021601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.362419,"lon":-110.224381,"icon":""}]} |
Location: 02/01-16-039-02W4/0 | |
Location Alias: 02/01-16-39-02 W4M | |
Location Alias 2: 02/01-16-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 16 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: SURGE ENERGY 102 PROVOST 1-16-39-2 | |
Operator Name: Surge Energy Inc. | |
License Number: 0493996 | |
License Date: 2019-03-19 | |
License Status: Amended | |
Spud Date: 2019-09-09 | |
Final Drill Date: 2019-09-13 | |
Well Total Depth: 2327.00 m | |
Surface Hole Latitude: 52.362419 | |
Surface Hole Longitude: -110.224381 |
Date | Event |
---|---|
2019-03-19 | Obtained License |
2019-09-09 | Drill To LD |
2019-09-10 | Direction Drilling Operation Performed - Deviate |
2019-09-10 | Surface Casing Operation Performed |
2019-09-11 | Direction Drilling Operation Performed - Horizontal |
2019-09-13 | Finished Drilling |
2019-09-13 | Well Log Performed |
2019-09-13 | Well Mode changed to Drilled and Cased |
2019-09-14 | Production Casing Operation Performed |
2019-09-14 | Rig Released |
2019-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-31 | Well Began Production |
2019-10-31 | Well Fluid changed to Crude Oil |
2019-10-31 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-09-09 | Precision Drilling Corporation | 145 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-09-10 | 413.30 | Deviate (5 - 79 degrees) |
2019-09-11 | 864.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-10-09 | Multi-Stage Fracture | 2292.30 | 2292.40 | 0 |
2019-10-09 | Multi-Stage Fracture | 1798.40 | 1798.50 | 0 |
2019-10-09 | Multi-Stage Fracture | 1743.40 | 1743.50 | 0 |
2019-10-09 | Multi-Stage Fracture | 1688.00 | 1688.10 | 0 |
2019-10-09 | Multi-Stage Fracture | 1632.80 | 1632.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 1577.60 | 1577.70 | 0 |
2019-10-09 | Multi-Stage Fracture | 1522.40 | 1522.50 | 0 |
2019-10-09 | Multi-Stage Fracture | 1467.00 | 1467.10 | 0 |
2019-10-09 | Multi-Stage Fracture | 1411.70 | 1411.80 | 0 |
2019-10-09 | Multi-Stage Fracture | 1357.50 | 1357.60 | 0 |
2019-10-09 | Multi-Stage Fracture | 1301.80 | 1301.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 2237.00 | 2237.10 | 0 |
2019-10-09 | Multi-Stage Fracture | 1246.50 | 1246.60 | 0 |
2019-10-09 | Multi-Stage Fracture | 1191.40 | 1191.50 | 0 |
2019-10-09 | Multi-Stage Fracture | 1138.50 | 1138.60 | 0 |
2019-10-09 | Multi-Stage Fracture | 1083.20 | 1083.30 | 0 |
2019-10-09 | Multi-Stage Fracture | 1028.10 | 1028.20 | 0 |
2019-10-09 | Multi-Stage Fracture | 972.90 | 973.00 | 0 |
2019-10-09 | Multi-Stage Fracture | 918.60 | 918.70 | 0 |
2019-10-09 | Multi-Stage Fracture | 2184.20 | 2184.30 | 0 |
2019-10-09 | Multi-Stage Fracture | 2128.90 | 2129.00 | 0 |
2019-10-09 | Multi-Stage Fracture | 2073.90 | 2074.00 | 0 |
2019-10-09 | Multi-Stage Fracture | 2019.50 | 2019.60 | 0 |
2019-10-09 | Multi-Stage Fracture | 1964.20 | 1964.30 | 0 |
2019-10-09 | Multi-Stage Fracture | 1908.80 | 1908.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 1853.50 | 1853.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-10-09 | 2019-10-09 | 755 | 737 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 73.2136 | N/A | |||
16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 26.2927 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0207 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0207 | N/A | ||||
SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0508 | N/A | |
Sodium chloride | 7647-14-5 | 100 | 0.0508 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0768 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0768 | N/A | ||||
SBX-2C (Crosslinker) | STEP Energy Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0407 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0407 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0407 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0407 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.2549 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.2549 | N/A | ||||
SFE-5 (Nano Surfactant) | Step Energy Services | Surfactant | Proprietary | Trade Secret | 100 | 0.0494 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-10-10 | 2019-10-10 | Surface Water - Lake | 737 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1528 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-09-14 | No Incident Encountered | 0.00 | 0.00 |
2019-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]