X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394021504000

Well Details

Well ID: 0394021504000
Loading map...
Location: 00/04-15-039-02W4/0
Location Alias: 00/04-15-39-02 W4M
Location Alias 2: 00/04-15-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 15
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY HZ PROVOST 4-15-39-2
Operator Name: Surge Energy Inc.
License Number: 0494007
License Date: 2019-03-20
License Status: Amended
Spud Date: 2019-12-18
Final Drill Date: 2020-01-03
Well Total Depth: 2252.00 m
Surface Hole Latitude: 52.362178
Surface Hole Longitude: -110.212679

For data sources see[1][2]

Well History

Date Event
2019-03-20 Obtained License
2019-12-18 Set Surface
2019-12-18 Surface Casing Operation Performed
2019-12-31 Drill To LD
2020-01-01 Direction Drilling Operation Performed - Deviate
2020-01-01 Direction Drilling Operation Performed - Horizontal
2020-01-03 Finished Drilling
2020-01-03 Production Casing Operation Performed
2020-01-03 Well Log Performed
2020-01-03 Well Mode changed to Drilled and Cased
2020-01-04 Rig Released
2020-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-04 Well Began Production
2020-02-04 Well Fluid changed to Crude Oil
2020-02-04 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-18 Hertz & Paluck Energy Services Inc. 1 Set Surface
2019-12-31 Precision Drilling Corporation 145 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2020-01-01 399.60 Deviate (5 - 79 degrees)
2020-01-01 973.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-23 Multi-Stage Fracture 2205.00 2205.10 0
2020-01-23 Multi-Stage Fracture 1719.90 1720.00 0
2020-01-23 Multi-Stage Fracture 1665.00 1665.10 0
2020-01-23 Multi-Stage Fracture 1610.30 1610.40 0
2020-01-23 Multi-Stage Fracture 1555.30 1555.40 0
2020-01-23 Multi-Stage Fracture 1500.90 1501.00 0
2020-01-23 Multi-Stage Fracture 1446.30 1446.40 0
2020-01-23 Multi-Stage Fracture 1392.30 1392.40 0
2020-01-23 Multi-Stage Fracture 1337.60 1337.70 0
2020-01-23 Multi-Stage Fracture 1282.60 1282.70 0
2020-01-23 Multi-Stage Fracture 1227.40 1227.50 0
2020-01-23 Multi-Stage Fracture 2153.60 2153.70 0
2020-01-23 Multi-Stage Fracture 1172.50 1172.60 0
2020-01-23 Multi-Stage Fracture 1117.50 1117.60 0
2020-01-23 Multi-Stage Fracture 1062.70 1062.80 0
2020-01-23 Multi-Stage Fracture 1008.00 1008.10 0
2020-01-23 Multi-Stage Fracture 2102.80 2102.90 0
2020-01-23 Multi-Stage Fracture 2047.90 2048.00 0
2020-01-23 Multi-Stage Fracture 1993.10 1993.20 0
2020-01-23 Multi-Stage Fracture 1938.20 1938.30 0
2020-01-23 Multi-Stage Fracture 1883.70 1883.80 0
2020-01-23 Multi-Stage Fracture 1829.40 1829.50 0
2020-01-23 Multi-Stage Fracture 1774.80 1774.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-01-23 2020-01-23 757 793 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 76.9993 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.535 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0146 N/A
Methyl Alcohol 67-56-1 100 0.0146 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0479 N/A
Sodium chloride 7647-14-5 100 0.0479 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0712 N/A
Non-Hazardous Ingredients Not Available 100 0.0712 N/A
SBX-2C (Crosslinker) STEP Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0389 N/A
Ethylene Glycol 107-21-1 100 0.0389 N/A
Monoethanolamine 141-43-5 100 0.0389 N/A
Water 7732-18-5 100 0.0389 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2445 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2445 N/A
SFE-5W (Nano Surfactant) Step Energy Services Surfactant Methanol 67-56-1 100 0.0483 N/A
Proprietary Trade Secret 100 0.0483 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2020-01-24 2020-01-24 Surface Water - Lake 794

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1319 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-04 No Incident Encountered 0.00 0.00
2020-01-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References