If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394021107020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.337962,"lon":-110.18441,"icon":""}]} |
Location: 02/07-11-039-02W4/0 | |
Location Alias: 02/07-11-39-02 W4M | |
Location Alias 2: 02/07-11-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 11 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 7-11-39-2 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0215615 | |
License Date: 1998-06-03 | |
License Status: Abandoned | |
Spud Date: 1998-06-09 | |
Final Drill Date: 1998-06-12 | |
Well Total Depth: 831.00 m | |
Surface Hole Latitude: 52.337962 | |
Surface Hole Longitude: -110.184410 |
Date | Event |
---|---|
1998-06-03 | Obtained License |
1998-06-09 | Surface Casing Operation Performed |
1998-06-11 | Well Log Performed |
1998-06-12 | Finished Drilling |
1998-06-12 | Production Casing Operation Performed |
1998-06-12 | Rig Released |
1998-06-12 | Well Mode changed to Drilled and Cased |
1998-06-16 | Perforation Treatment Performed - Jet Perforation |
1998-06-23 | Well Began Production |
1998-06-23 | Well Fluid changed to Crude Oil |
1998-06-23 | Well Mode changed to Pumping |
1999-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-29 | Perforation Treatment Performed - Jet Perforation |
1999-09-29 | Plug Back Performed |
1999-09-29 | Well Fluid changed to Crude Oil |
1999-09-29 | Well Mode changed to Suspended |
1999-09-30 | Well Fluid changed to Crude Oil |
1999-09-30 | Well Mode changed to Abandoned Zone |
1999-12-15 | Perforation Treatment Performed - Jet Perforation |
2006-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-11-20 | Plug Back Performed |
2007-05-30 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-06-16 | Perforation | 774.00 | 775.00 | 13 |
1999-09-29 | Packing Device Capped w/Cement | 762.00 | 770.00 | 0 |
1999-09-29 | Perforation | 687.00 | 688.30 | 13 |
1999-12-15 | Perforation | 682.00 | 683.50 | 14 |
2006-11-20 | Packing Device Capped w/Cement | 671.90 | 679.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 4311 | 0.0 | 0.0 | 0.0 |
1999 | 6142 | 0.0 | 0.0 | 0.0 |
For data sources see[5]