If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394021104032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.332933,"lon":-110.198281,"icon":""}]} |
Location: 03/04-11-039-02W4/2 | |
Location Alias: 03/04-11-39-02 W4M | |
Location Alias 2: 03/04-11-039-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 11 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 4-11-39-2 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0224294 | |
License Date: 1999-07-08 | |
License Status: Issued | |
Spud Date: 1999-07-31 | |
Final Drill Date: 1999-08-06 | |
Well Total Depth: 1097.00 m | |
Surface Hole Latitude: 52.332933 | |
Surface Hole Longitude: -110.198281 |
Date | Event |
---|---|
1999-07-08 | Obtained License |
1999-08-01 | Surface Casing Operation Performed |
1999-08-02 | Direction Drilling Operation Performed - Horizontal |
1999-08-04 | Intermediate Casing Operation Performed |
1999-08-05 | Direction Drilling Operation Performed - Horizontal |
1999-08-06 | Finished Drilling |
1999-08-06 | Liner Casing Operation Performed |
1999-08-06 | Perforation Treatment Performed - Slotted Liner or Casing |
1999-08-06 | Rig Released |
1999-08-06 | Well Mode changed to Drilled and Cased |
1999-08-31 | Well Began Production |
1999-08-31 | Well Fluid changed to Crude Oil |
1999-08-31 | Well Mode changed to Pumping |
1999-09-02 | Well Log Performed |
2016-07-22 | Well Fluid changed to Crude Oil |
2016-07-22 | Well Mode changed to Suspended |
2017-09-05 | Well Fluid changed to Crude Oil |
2017-09-05 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-08-02 | 565.00 | Horizontal |
1999-08-05 | 982.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-08-06 | Slotted Liner | 885.00 | 1097.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 2730 | 0.0 | 0.0 | 0.0 |
2000 | 8290 | 0.0 | 0.0 | 0.0 |
2001 | 8574 | 0.0 | 0.0 | 0.0 |
2002 | 8219 | 0.0 | 0.0 | 0.0 |
2003 | 8689 | 0.0 | 0.0 | 0.0 |
2004 | 8239 | 0.0 | 0.0 | 0.0 |
2005 | 8473 | 0.0 | 0.0 | 0.0 |
2006 | 8560 | 0.0 | 0.0 | 0.0 |
2007 | 8711 | 0.0 | 0.0 | 0.0 |
2008 | 8677 | 0.0 | 0.0 | 0.0 |
2009 | 8650 | 0.0 | 0.0 | 0.0 |
2010 | 8266 | 0.0 | 0.0 | 0.0 |
2011 | 8600 | 0.0 | 0.0 | 0.0 |
2012 | 8640 | 0.0 | 0.0 | 0.0 |
2013 | 8664 | 0.0 | 0.0 | 0.0 |
2014 | 7910 | 0.0 | 0.0 | 0.0 |
2015 | 3524 | 0.0 | 0.0 | 0.0 |
2017 | 2813 | 0.0 | 0.0 | 0.0 |
2018 | 8617 | 0.0 | 0.0 | 0.0 |
2019 | 6861 | 0.0 | 0.0 | 0.0 |
2020 | 2004 | 0.0 | 0.0 | 0.0 |
For data sources see[6]