X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394020216040

Well Details

Well ID: 0394020216040
Loading map...
Location: 04/16-02-039-02W4/0
Location Alias: 04/16-02-39-02 W4M
Location Alias 2: 04/16-02-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 16-2-39-2
Operator Name: Bow River Energy Ltd.
License Number: 0211107
License Date: 1997-12-20
License Status: Suspension
Spud Date: 1998-01-10
Final Drill Date: 1998-01-13
Well Total Depth: 849.00 m
Surface Hole Latitude: 52.328170
Surface Hole Longitude: -110.175047

For data sources see[1][2]

Well History

Date Event
1997-12-20 Obtained License
1998-01-11 Direction Drilling Operation Performed - Deviate
1998-01-11 Surface Casing Operation Performed
1998-01-13 Finished Drilling
1998-01-13 Well Log Performed
1998-01-13 Well Mode changed to Drilled and Cased
1998-01-14 Production Casing Operation Performed
1998-01-14 Rig Released
1998-01-14 Well Log Performed
1998-01-31 Well Log Performed
1998-02-25 Well Log Performed
1998-02-26 Perforation Treatment Performed - Jet Perforation
1998-02-27 Well Log Performed
1998-02-28 Perforation Treatment Performed - Jet Perforation
1998-03-10 Well Began Production
1998-03-10 Well Fluid changed to Crude Oil
1998-03-10 Well Mode changed to Pumping
2015-11-05 Well Fluid changed to Crude Oil
2015-11-05 Well Mode changed to Suspended
2017-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-20 Plug Back Performed
2017-01-20 Well Fluid changed to Crude Oil
2017-01-20 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-01-11 300.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-26 Perforation 783.00 785.00 13
1998-02-26 Perforation 785.00 789.00 13
1998-02-26 Perforation 789.00 790.00 13
1998-02-28 Perforation 783.00 785.00 13
2017-01-20 Packing Device Capped w/Cement 525.50 778.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6973 0.0 0.0 0.0
1999 8544 0.0 0.0 0.0
2000 8681 0.0 0.0 0.0
2001 8665 0.0 0.0 0.0
2002 1952 0.0 0.0 0.0
2003 3643 0.0 0.0 0.0
2004 8483 0.0 0.0 0.0
2005 8693 0.0 0.0 0.0
2006 4736 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 7421 0.0 0.0 0.0
2009 8674 0.0 0.0 0.0
2010 8636 0.0 0.0 0.0
2011 8001 0.0 0.0 0.0
2012 8629 0.0 0.0 0.0
2013 8631 0.0 0.0 0.0
2014 1791 0.0 0.0 0.0
2015 1872 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References