X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394020209030

Well Details

Well ID: 0394020209030
Loading map...
Location: 03/09-02-039-02W4/0
Location Alias: 03/09-02-39-02 W4M
Location Alias 2: 03/09-02-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 9-2-39-2
Operator Name: Bow River Energy Ltd.
License Number: 0211113
License Date: 1997-12-20
License Status: Suspension
Spud Date: 1998-01-05
Final Drill Date: 1998-01-08
Well Total Depth: 838.00 m
Surface Hole Latitude: 52.327922
Surface Hole Longitude: -110.175362

For data sources see[1][2]

Well History

Date Event
1997-12-20 Obtained License
1998-01-06 Surface Casing Operation Performed
1998-01-07 Direction Drilling Operation Performed - Deviate
1998-01-08 Finished Drilling
1998-01-08 Well Mode changed to Drilled and Cased
1998-01-09 Production Casing Operation Performed
1998-01-09 Rig Released
1998-01-09 Well Log Performed
1998-01-31 Well Log Performed
1998-02-02 Well Log Performed
1998-02-03 Perforation Treatment Performed - Jet Perforation
1998-02-21 Well Log Performed
1998-02-22 Perforation Treatment Performed - Jet Perforation
1998-02-23 Well Log Performed
1998-03-21 Well Began Injection
1998-03-21 Well Fluid changed to Water
1998-03-21 Well Type changed to Disposal
2017-01-26 Perforation Treatment Performed - Remedial Casing
2017-01-27 Perforation Treatment Performed - Cement Plug
2017-01-27 Plug Back Performed
2017-01-27 Well Fluid changed to Water
2017-01-27 Well Mode changed to Abandoned Zone
2017-01-27 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-01-07 347.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-03 Perforation 785.80 788.00 13
1998-02-22 Perforation 796.00 812.60 13
2017-01-26 Remedial Casing Cementing 785.80 788.00 0
2017-01-27 Cement Plug 625.20 794.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-20 No Incident Encountered 0.00 0.00
2017-01-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References