X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394020209002

Well Details

Well ID: 0394020209002
Loading map...
Location: 00/09-02-039-02W4/2
Location Alias: 00/09-02-39-02 W4M
Location Alias 2: 00/09-02-039-02 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 9-2-39-2
Operator Name: Bow River Energy Ltd.
License Number: 0208523
License Date: 1997-11-13
License Status: Suspension
Spud Date: 1997-12-02
Final Drill Date: 1997-12-04
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.326149
Surface Hole Longitude: -110.178118

For data sources see[1][2]

Well History

Date Event
1997-11-13 Obtained License
1997-12-03 Surface Casing Operation Performed
1997-12-04 Finished Drilling
1997-12-04 Well Mode changed to Drilled and Cased
1997-12-05 Production Casing Operation Performed
1997-12-05 Rig Released
1997-12-05 Well Log Performed
1997-12-08 Perforation Treatment Performed - Jet Perforation
1997-12-08 Well Log Performed
1998-10-31 Perforation Treatment Performed - Cement Squeeze
1998-10-31 Plug Back Performed
1998-11-01 Perforation Treatment Performed - Jet Perforation
1998-11-02 Well Began Production
1998-11-02 Well Fluid changed to Crude Oil
1998-11-02 Well Mode changed to Pumping
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
1999-09-25 Well Fluid changed to Crude Oil
1999-09-25 Well Mode changed to Pumping
2006-06-14 Well Fluid changed to Crude Oil
2006-06-14 Well Mode changed to Suspended
2009-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-10 Well Log Performed
2009-01-11 Perforation Treatment Performed - Jet Perforation
2009-01-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-08 Perforation 698.50 700.50 17
1998-10-31 Cement Squeeze 698.50 700.50 0
1998-11-01 Perforation 784.50 786.00 17
2009-01-10 Packing Device Capped w/Cement 772.00 780.00 0
2009-01-11 Perforation 698.50 700.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1430 0.0 0.0 0.0
1999 2269 0.0 0.0 0.0
2000 8084 0.0 0.0 0.0
2001 8603 0.0 0.0 0.0
2002 3520 0.0 0.0 0.0

For data sources see[5]

References