X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385080203020

Well Details

Well ID: 0385080203020
Loading map...
Location: 02/03-02-038-08W5/0
Location Alias: 02/03-02-38-08 W5M
Location Alias 2: 02/03-02-038-08 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 08
Section: 02
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 3-2-38-8
Operator Name: Yangarra Resources Corp.
License Number: 0443035
License Date: 2012-01-19
License Status: Issued
Spud Date: 2012-02-01
Final Drill Date: 2012-02-22
Well Total Depth: 3580.00 m
Surface Hole Latitude: 52.247025
Surface Hole Longitude: -115.042635

For data sources see[1][2]

Well History

Date Event
2012-01-19 Obtained License
2012-02-04 Surface Casing Operation Performed
2012-02-10 Well Log Performed
2012-02-11 Direction Drilling Operation Performed - Deviate
2012-02-11 Intermediate Casing Operation Performed
2012-02-13 Direction Drilling Operation Performed - Horizontal
2012-02-13 Well Log Performed
2012-02-22 Finished Drilling
2012-02-22 Well Log Performed
2012-02-22 Well Mode changed to Drilled and Cased
2012-02-25 Liner Casing Operation Performed
2012-02-26 Perforation Treatment Performed - Open-Hole Completion
2012-02-26 Rig Released
2012-03-03 Well Log Performed
2012-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-28 Well Began Production
2012-03-28 Well Fluid changed to Crude Oil
2012-03-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-01 Trinidad Drilling Ltd. 92 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-11 2043.00 Deviate (5 - 79 degrees)
2012-02-13 2444.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-26 Open Hole/Barefoot Completion 3561.90 3580.00 0
2012-03-05 Multi-Stage Fracture 2714.50 2715.60 0
2012-03-05 Multi-Stage Fracture 2617.80 2618.80 0
2012-03-05 Multi-Stage Fracture 2509.50 2510.60 0
2012-03-05 Multi-Stage Fracture 3548.10 3548.90 0
2012-03-05 Multi-Stage Fracture 3443.50 3444.40 0
2012-03-05 Multi-Stage Fracture 3360.50 3361.40 0
2012-03-05 Multi-Stage Fracture 3241.60 3242.50 0
2012-03-05 Multi-Stage Fracture 3145.90 3146.80 0
2012-03-05 Multi-Stage Fracture 3027.00 3027.90 0
2012-03-05 Multi-Stage Fracture 2930.40 2931.30 0
2012-03-05 Multi-Stage Fracture 2834.50 2835.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3520 0.0 0.0 0.0
2013 7266 0.0 0.0 0.0
2014 8097 0.0 0.0 0.0
2015 6894 0.0 0.0 0.0
2016 8122 0.0 0.0 0.0
2017 8272 0.0 0.0 0.0
2018 7049 0.0 0.0 0.0
2019 7565 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[7]

References