X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385042510000

Well Details

Well ID: 0385042510000
Loading map...
Location: 00/10-25-038-04W5/0
Location Alias: 00/10-25-38-04 W5M
Location Alias 2: 00/10-25-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 25
County/Municipality: Lacombe County
Well Name: CERTUS MEDRIV 10-25-38-4
Operator Name: Certus Oil And Gas Inc.
License Number: 0022831
License Date: 1962-08-09
License Status: Abandoned
Spud Date: 1962-08-09
Final Drill Date: 1962-08-25
Well Total Depth: 2286.00 m
Surface Hole Latitude: 52.299005
Surface Hole Longitude: -114.439016

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-09 Obtained License
1962-08-22 Drill Stem Test Performed
1962-08-23 Drill Stem Test Performed
1962-08-25 Finished Drilling
1962-08-25 Well Mode changed to Drilled and Cased
1962-08-27 Production Casing Operation Performed
1962-09-13 Perforation Treatment Performed - Bullet Perforation
1962-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-18 Perforation Treatment Performed - Bullet Perforation
1962-09-18 Perforation Treatment Performed - Fractured
1962-09-30 Well Began Production
1962-09-30 Well Fluid changed to Crude Oil
1962-09-30 Well Mode changed to Pumping
1988-05-11 Perforation Treatment Performed - Acid Wash - No Pressure
1995-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-01 Well Fluid changed to Crude Oil
2003-10-01 Well Mode changed to Suspended
2007-03-02 Well Log Performed
2007-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-03 Plug Back Performed
2007-03-03 Well Fluid changed to Crude Oil
2007-03-03 Well Mode changed to Abandoned Zone
2007-03-05 Perforation Treatment Performed - Jet Perforation
2007-03-05 Well Log Performed
2007-03-08 Perforation Treatment Performed - Fractured
2010-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-24 Perforation Treatment Performed - Jet Perforation
2010-07-24 Plug Back Performed
2010-07-25 Perforation Treatment Performed - Cement Plug
2010-07-25 Plug Back Performed
2010-07-26 Perforation Treatment Performed - Jet Perforation
2010-07-26 Well Log Performed
2010-07-27 Perforation Treatment Performed - Cement Plug
2010-07-27 Plug Back Performed
2010-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-28 Perforation Treatment Performed - Jet Perforation
2010-07-28 Plug Back Performed
2010-07-28 Well Log Performed
2010-07-29 Perforation Treatment Performed - Cement Plug
2010-07-29 Plug Back Performed
2010-07-30 Perforation Treatment Performed - Jet Perforation
2010-07-30 Well Log Performed
2010-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-03 Perforation Treatment Performed - Jet Perforation
2010-08-03 Plug Back Performed
2010-08-03 Well Log Performed
2010-08-04 Perforation Treatment Performed - Cement Plug
2010-08-04 Plug Back Performed
2010-08-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-09-13 Bullet Perforation 2225.60 2226.90 7
2007-03-08 Fracture 2172.30 2174.10 0
2010-07-24 Packing Device Capped w/Cement 2162.00 2170.00 0
2010-07-24 Perforation 1718.00 1719.00 13
2010-07-25 Cement Plug 1625.00 1740.00 0
2010-07-26 Perforation 1106.00 1107.00 13
2010-07-27 Cement Plug 1105.50 1131.00 0
2010-07-28 Perforation 580.00 581.00 13
2010-07-28 Packing Device Capped w/Cement 1094.00 1102.00 0
2010-07-29 Cement Plug 566.00 581.50 0
2010-07-30 Perforation 477.00 478.00 13
1962-09-14 Acid Treatment 2225.60 2226.90 0
2010-07-30 Perforation 440.00 441.00 13
2010-08-03 Perforation 360.00 361.00 13
2010-08-03 Perforation 343.00 344.00 13
2010-08-03 Packing Device Capped w/Cement 349.00 358.00 0
2010-08-04 Cement Plug 332.00 340.00 0
1962-09-18 Bullet Perforation 2222.00 2225.00 7
1962-09-18 Fracture 2222.00 2225.60 0
1962-09-18 Acid Treatment 2222.00 2225.60 0
1988-05-11 Acid Wash 2222.00 2225.60 0
1995-02-09 Acid Treatment 2222.00 2226.90 0
2007-03-03 Packing Device Capped w/Cement 2211.00 2219.00 0
2007-03-05 Perforation 2172.30 2174.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1448 0.0 0.0 0.0
1969 3242 0.0 0.0 0.0
1970 2454 0.0 0.0 0.0
1971 1884 0.0 0.0 0.0
1972 2634 0.0 0.0 0.0
1973 6180 0.0 0.0 0.0
1974 8088 0.0 0.0 0.0
1975 7522 0.0 0.0 0.0
1976 8727 0.0 0.0 0.0
1977 8519 0.0 0.0 0.0
1978 8706 0.0 0.0 0.0
1979 8652 0.0 0.0 0.0
1980 7855 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 8386 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8468 0.0 0.0 0.0
1985 7943 0.0 0.0 0.0
1986 7758 0.0 0.0 0.0
1987 8615 0.0 0.0 0.0
1988 7631 0.0 0.0 0.0
1989 8591 0.0 0.0 0.0
1990 8699 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 7963 0.0 0.0 0.0
1993 7802 0.0 0.0 0.0
1994 8748 0.0 0.0 0.0
1995 7679 0.0 0.0 0.0
1996 5649 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 8655 0.0 0.0 0.0
1999 6335 0.0 0.0 0.0
2003 25 0.0 0.0 0.0

For data sources see[5]

References