If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385041202003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.247598,"lon":-114.439058,"icon":""}]} |
Location: 00/02-12-038-04W5/3 | |
Location Alias: 00/02-12-38-04 W5M | |
Location Alias 2: 00/02-12-038-04 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 04 | |
Section: 12 | |
County/Municipality: Clearwater County | |
Well Name: GULF SYLVAN LAKE 2-12-38-4 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0056237 | |
License Date: 1975-12-15 | |
License Status: Abandoned | |
Spud Date: 1975-12-17 | |
Final Drill Date: 1975-12-20 | |
Well Total Depth: 2324.10 m | |
Surface Hole Latitude: 52.247598 | |
Surface Hole Longitude: -114.439058 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-12-15 | Obtained License |
1975-12-20 | Finished Drilling |
1975-12-20 | Well Mode changed to Drilled and Cased |
1975-12-21 | Perforation Treatment Performed - Jet Perforation |
1975-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-01-05 | Perforation Treatment Performed - Fractured |
1997-02-12 | Perforation Treatment Performed - Jet Perforation |
1997-02-19 | Perforation Treatment Performed - Cement Squeeze |
1997-02-19 | Plug Back Performed |
1997-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-02-21 | Perforation Treatment Performed - Jet Perforation |
1997-02-27 | Well Began Production |
1997-02-27 | Well Fluid changed to Crude Oil |
1997-02-27 | Well Mode changed to Pumping |
1997-04-01 | Well Fluid changed to Crude Oil |
1997-04-01 | Well Mode changed to Suspended |
2006-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-02 | Plug Back Performed |
2006-02-02 | Well Fluid changed to Crude Oil |
2006-02-02 | Well Mode changed to Abandoned Zone |
2006-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-03 | Perforation Treatment Performed - Jet Perforation |
2006-02-03 | Plug Back Performed |
2006-02-04 | Perforation Treatment Performed - Jet Perforation |
2006-02-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-05 | Perforation Treatment Performed - Jet Perforation |
2006-02-05 | Perforation Treatment Performed - Remedial Casing |
2006-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-06 | Perforation Treatment Performed - Jet Perforation |
2006-02-06 | Perforation Treatment Performed - Remedial Casing |
2006-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-07 | Perforation Treatment Performed - Jet Perforation |
2006-02-07 | Perforation Treatment Performed - Remedial Casing |
2006-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-08 | Perforation Treatment Performed - Jet Perforation |
2006-02-08 | Perforation Treatment Performed - Remedial Casing |
2006-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-09 | Perforation Treatment Performed - Jet Perforation |
2006-02-09 | Perforation Treatment Performed - Remedial Casing |
2006-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-14 | Perforation Treatment Performed - Jet Perforation |
2006-02-14 | Perforation Treatment Performed - Remedial Casing |
2006-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-16 | Perforation Treatment Performed - Jet Perforation |
2006-02-16 | Perforation Treatment Performed - Remedial Casing |
2006-02-17 | Perforation Treatment Performed - Remedial Casing |
2006-02-18 | Perforation Treatment Performed - Cement Plug |
2006-03-18 | Well Abandoned |
2006-03-18 | Well Fluid changed to Crude Oil |
2006-03-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-12-21 | Perforation | 2196.10 | 2197.00 | 3 |
2006-02-02 | Packing Device Capped w/Cement | 2268.00 | 2276.00 | 0 |
2006-02-03 | Packing Device Capped w/Cement | 2178.00 | 2186.00 | 0 |
2006-02-03 | Perforation | 1390.00 | 1391.00 | 20 |
2006-02-03 | Packing Device Capped w/Cement | 2232.00 | 2240.00 | 0 |
2006-02-04 | Perforation | 900.00 | 901.00 | 20 |
2006-02-05 | Remedial Casing Cementing | 1390.00 | 1391.00 | 0 |
2006-02-05 | Packing Device Capped w/Cement | 1379.00 | 1387.00 | 0 |
2006-02-05 | Perforation | 1340.00 | 1341.00 | 20 |
2006-02-06 | Remedial Casing Cementing | 1340.00 | 1341.00 | 0 |
2006-02-06 | Perforation | 1309.00 | 1310.00 | 20 |
1975-12-21 | Perforation | 2197.90 | 2199.10 | 3 |
2006-02-06 | Remedial Casing Cementing | 1309.00 | 1310.00 | 0 |
2006-02-06 | Packing Device Capped w/Cement | 1251.00 | 1337.00 | 0 |
2006-02-07 | Perforation | 1234.00 | 1235.00 | 20 |
2006-02-07 | Remedial Casing Cementing | 1234.00 | 1235.00 | 0 |
2006-02-07 | Packing Device Capped w/Cement | 1100.00 | 1231.00 | 0 |
2006-02-08 | Perforation | 1075.00 | 1076.00 | 20 |
2006-02-08 | Remedial Casing Cementing | 1075.00 | 1076.00 | 0 |
2006-02-08 | Packing Device Capped w/Cement | 885.00 | 1072.00 | 0 |
2006-02-09 | Perforation | 810.00 | 811.00 | 20 |
2006-02-09 | Remedial Casing Cementing | 810.00 | 811.00 | 0 |
1975-12-21 | Perforation | 2200.70 | 2205.50 | 3 |
2006-02-09 | Packing Device Capped w/Cement | 713.00 | 806.00 | 0 |
2006-02-14 | Perforation | 560.00 | 561.00 | 20 |
2006-02-14 | Remedial Casing Cementing | 560.00 | 561.00 | 0 |
2006-02-14 | Packing Device Capped w/Cement | 483.00 | 707.00 | 0 |
2006-02-16 | Perforation | 475.00 | 476.00 | 20 |
2006-02-16 | Remedial Casing Cementing | 475.00 | 476.00 | 0 |
2006-02-16 | Packing Device Capped w/Cement | 463.00 | 471.00 | 0 |
2006-02-16 | Perforation | 247.00 | 248.00 | 20 |
2006-02-17 | Remedial Casing Cementing | 247.00 | 248.00 | 0 |
2006-02-18 | Cement Plug | 223.00 | 268.00 | 0 |
1975-12-22 | Acid Treatment | 2196.10 | 2205.50 | 0 |
1976-01-05 | Fracture | 2196.10 | 2205.50 | 0 |
1997-02-12 | Perforation | 2292.40 | 2294.20 | 7 |
1997-02-19 | Cement Squeeze | 2292.40 | 2294.20 | 0 |
1997-02-21 | Perforation | 2286.00 | 2292.00 | 17 |
1997-02-21 | Acid Treatment | 2286.00 | 2292.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 476 | 0.0 | 0.0 | 0.0 |
For data sources see[5]