X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385041202000

Well Details

Well ID: 0385041202000
Loading map...
Location: 00/02-12-038-04W5/0
Location Alias: 00/02-12-38-04 W5M
Location Alias 2: 00/02-12-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 12
County/Municipality: Clearwater County
Well Name: B.A. BRINK SYLAKE 2-12-38-4
Operator Name: Gulf Canada Limited
License Number: 0026930
License Date: 1964-10-07
License Status: Re-Entered
Spud Date: 1964-10-30
Final Drill Date: 1964-11-14
Well Total Depth: 2324.10 m
Surface Hole Latitude: 52.247598
Surface Hole Longitude: -114.439098

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-07 Obtained License
1964-11-14 Finished Drilling
1964-11-14 Well Mode changed to Drilled and Cased
1964-11-15 Drill Stem Test Performed
1964-11-17 Drill Stem Test Performed
1964-11-19 Drill Stem Test Performed
1964-11-22 Drill Stem Test Performed
1964-11-24 Drill Stem Test Performed
1964-11-25 Production Casing Operation Performed
1964-11-26 Rig Released
1964-11-30 Perforation Treatment Performed - Jet Perforation
1964-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-01 Perforation Treatment Performed - Acid Wash - No Pressure
1964-12-01 Perforation Treatment Performed - Nitrogen Treatment
1964-12-04 Well Began Production
1964-12-04 Well Fluid changed to Crude Oil
1964-12-04 Well Mode changed to Flowing
1965-01-15 Perforation Treatment Performed - Cement Squeeze
1965-01-21 Perforation Treatment Performed - Jet Perforation
1965-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-23 Perforation Treatment Performed - Acid Wash - No Pressure
1965-01-30 Well Fluid changed to Crude Oil
1965-01-30 Well Mode changed to Pumping
1965-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-02-26 Perforation Treatment Performed - Jet Perforation
1965-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-08 Well Fluid changed to Crude Oil
1965-04-08 Well Mode changed to Suspended
1968-03-15 Perforation Treatment Performed - Cement Plug
1968-03-15 Plug Back Performed
1968-03-15 Well Abandoned
1968-03-15 Well Fluid changed to Crude Oil
1968-03-15 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-30 Perforation 2288.10 2291.80 7
1965-02-26 Perforation 2250.60 2252.50 7
1965-02-26 Perforation 2253.10 2253.70 7
1965-02-26 Perforation 2254.90 2256.10 7
1965-02-26 Perforation 2256.70 2258.00 7
1965-03-02 Acid Treatment 2250.60 2258.00 0
1968-03-15 Cement Plug 2156.20 2262.80 0
1964-12-01 Acid Wash 2288.10 2291.80 0
1964-12-01 Acid Treatment 2288.10 2291.80 0
1964-12-01 Nitrogen Treatment 2288.10 2291.80 0
1965-01-15 Cement Squeeze 2288.10 2291.80 0
1965-01-21 Perforation 2292.40 2294.20 7
1965-01-23 Acid Wash 2292.40 2294.20 0
1965-01-23 Acid Treatment 2292.40 2294.20 0
1965-02-25 Packing Device Capped w/Cement 2262.80 2276.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References