X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385041012000

Well Details

Well ID: 0385041012000
Loading map...
Location: 00/12-10-038-04W5/0
Location Alias: 00/12-10-38-04 W5M
Location Alias 2: 00/12-10-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 10
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 12-10-38-4
Operator Name: Cenovus Energy Inc.
License Number: 0105292
License Date: 1984-01-16
License Status: RecCertified
Spud Date: 1984-03-02
Final Drill Date: 1984-04-01
Well Total Depth: 3080.00 m
Surface Hole Latitude: 52.254414
Surface Hole Longitude: -114.499751

For data sources see[1][2]

Well History

Date Event
1984-01-16 Obtained License
1984-04-01 Finished Drilling
1984-04-02 Well Log Performed
1984-04-04 Drill Stem Test Performed
1984-04-05 Drill Stem Test Performed
1984-04-07 Well Log Performed
1984-04-08 Production Casing Operation Performed
1984-04-09 Well Mode changed to Drilled and Cased
1984-12-08 Well Log Performed
1984-12-09 Perforation Treatment Performed - Jet Perforation
1984-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-14 Well Log Performed
1984-12-15 Perforation Treatment Performed - Cement Squeeze
1984-12-15 Perforation Treatment Performed - Jet Perforation
1984-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-12 Well Began Production
1994-05-12 Well Fluid changed to Crude Oil
1994-05-12 Well Mode changed to Flowing
1994-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-26 Well Fluid changed to Crude Oil
1995-05-26 Well Mode changed to Pumping
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Suspended
2006-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-09 Perforation Treatment Performed - Jet Perforation
2006-03-09 Plug Back Performed
2006-03-09 Well Fluid changed to Crude Oil
2006-03-09 Well Log Performed
2006-03-09 Well Mode changed to Abandoned Zone
2006-03-10 Perforation Treatment Performed - Remedial Casing
2006-03-10 Well Log Performed
2006-03-11 Perforation Treatment Performed - Jet Perforation
2006-03-11 Perforation Treatment Performed - Remedial Casing
2006-03-12 Perforation Treatment Performed - Jet Perforation
2006-03-12 Perforation Treatment Performed - Remedial Casing
2006-03-12 Well Log Performed
2006-03-13 Perforation Treatment Performed - Jet Perforation
2006-03-13 Perforation Treatment Performed - Remedial Casing
2006-03-13 Well Log Performed
2006-03-18 Well Abandoned
2006-03-18 Well Fluid changed to Crude Oil
2006-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-09 Perforation 2388.50 2392.50 13
2006-03-10 Remedial Casing Cementing 896.00 897.00 0
2006-03-11 Perforation 739.00 740.00 20
2006-03-11 Remedial Casing Cementing 739.00 740.00 0
2006-03-12 Perforation 640.00 641.00 20
2006-03-12 Remedial Casing Cementing 640.00 641.00 0
2006-03-13 Perforation 520.00 521.00 20
2006-03-13 Remedial Casing Cementing 520.00 521.00 0
1984-12-11 Acid Treatment 2388.50 2392.50 0
1984-12-15 Cement Squeeze 2388.50 2392.50 0
1984-12-15 Perforation 2383.00 2384.00 13
1984-12-15 Perforation 2377.50 2378.50 13
1984-12-17 Acid Treatment 2377.50 2378.50 0
1994-06-16 Acid Treatment 2377.50 2384.00 0
2006-03-09 Packing Device Capped w/Cement 2360.00 2368.00 0
2006-03-09 Perforation 896.00 897.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3461 0.0 0.0 0.0
1995 1390 0.0 0.0 0.0

For data sources see[5]

References