X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385040110002

Well Details

Well ID: 0385040110002
Loading map...
Location: 00/10-01-038-04W5/2
Location Alias: 00/10-01-38-04 W5M
Location Alias 2: 00/10-01-038-04 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 01
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 10-1-38-4
Operator Name: Cenovus Energy Inc.
License Number: 0025004
License Date: 1963-10-23
License Status: Abandoned
Spud Date: 1963-11-15
Final Drill Date: 1963-12-05
Well Total Depth: 2327.10 m
Surface Hole Latitude: 52.240882
Surface Hole Longitude: -114.439061

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-23 Obtained License
1963-12-05 Finished Drilling
1963-12-06 Drill Stem Test Performed
1963-12-07 Drill Stem Test Performed
1963-12-08 Drill Stem Test Performed
1963-12-09 Drill Stem Test Performed
1963-12-10 Drill Stem Test Performed
1963-12-11 Production Casing Operation Performed
1963-12-21 Perforation Treatment Performed - Jet Perforation
1963-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-30 Perforation Treatment Performed - Jet Perforation
1964-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-16 Well Mode changed to Drilled and Cased
1989-11-23 Perforation Treatment Performed - Jet Perforation
1989-11-23 Well Log Performed
1989-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-23 Perforation Treatment Performed - Cement Squeeze
1993-05-04 Well Began Production
1993-05-04 Well Fluid changed to Crude Oil
1993-05-04 Well Mode changed to Flowing
1993-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-06 Well Log Performed
1993-05-07 Perforation Treatment Performed - Jet Perforation
1993-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-13 Well Log Performed
1995-11-30 Perforation Treatment Performed - Jet Perforation
1995-11-30 Well Fluid changed to Crude Oil
1995-11-30 Well Log Performed
1995-11-30 Well Mode changed to Suspended
1995-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-08 Perforation Treatment Performed - Jet Perforation
1997-02-08 Plug Back Performed
1997-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-27 Perforation Treatment Performed - Cement Plug
1998-06-27 Plug Back Performed
1998-06-27 Well Fluid changed to Crude Oil
1998-06-27 Well Mode changed to Abandoned Zone
1998-06-30 Perforation Treatment Performed - Cement Plug
1998-06-30 Perforation Treatment Performed - Jet Perforation
1998-06-30 Perforation Treatment Performed - Remedial Casing
1998-07-31 Well Abandoned
1998-07-31 Well Fluid changed to Crude Oil
1998-07-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-21 Perforation 2248.80 2250.00 7
1989-11-23 Perforation 2256.70 2261.60 13
1989-11-27 Acid Treatment 2248.80 2261.60 0
1993-04-23 Cement Squeeze 2248.00 2261.60 0
1993-05-06 Acid Treatment 2289.40 2292.70 0
1993-05-07 Perforation 2289.00 2293.30 13
1993-05-08 Acid Treatment 2289.00 2293.30 0
1995-11-30 Perforation 2272.00 2278.00 18
1995-12-01 Acid Treatment 2272.00 2278.00 0
1995-12-04 Acid Treatment 2272.00 2278.00 0
1997-01-18 Acid Treatment 2272.00 2278.00 0
1963-12-21 Perforation 2252.50 2253.40 7
1997-02-08 Packing Device Capped w/Cement 2277.00 2280.00 0
1997-02-08 Perforation 2269.00 2271.00 17
1997-02-10 Acid Treatment 2269.00 2277.00 0
1997-02-12 Acid Treatment 2269.00 2277.00 0
1997-02-13 Acid Treatment 2269.00 2277.00 0
1998-06-27 Cement Plug 2037.00 2277.00 0
1998-06-30 Perforation 494.00 495.00 13
1998-06-30 Remedial Casing Cementing 494.00 495.00 0
1998-06-30 Cement Plug 365.00 495.00 0
1963-12-22 Acid Treatment 2248.80 2253.40 0
1964-01-18 Acid Treatment 2248.80 2253.40 0
1964-05-30 Perforation 2289.40 2290.90 7
1964-05-30 Perforation 2291.50 2292.70 7
1964-05-31 Acid Treatment 2289.40 2292.70 0
1989-11-23 Perforation 2248.80 2250.00 13
1989-11-23 Perforation 2251.90 2253.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5158 0.0 0.0 0.0
1994 1002 0.0 0.0 0.0

For data sources see[5]

References