X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385040104002

Well Details

Well ID: 0385040104002
Loading map...
Location: 00/04-01-038-04W5/2
Location Alias: 00/04-01-38-04 W5M
Location Alias 2: 00/04-01-038-04 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 01
County/Municipality: Clearwater County
Well Name: CNGL SYLAKE 4-1-38-4
Operator Name: Harvest Operations Corp.
License Number: 0159945
License Date: 1993-07-23
License Status: Suspension
Spud Date: 1993-07-31
Final Drill Date: 1993-08-13
Well Total Depth: 2360.00 m
Surface Hole Latitude: 52.234542
Surface Hole Longitude: -114.449062

For data sources see[1][2]

Well History

Date Event
1993-07-23 Obtained License
1993-08-01 Surface Casing Operation Performed
1993-08-13 Finished Drilling
1993-08-13 Well Log Performed
1993-08-13 Well Mode changed to Drilled and Cased
1993-08-14 Well Log Performed
1993-08-15 Production Casing Operation Performed
1993-08-16 Rig Released
1993-08-28 Perforation Treatment Performed - Jet Perforation
1993-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-01 Perforation Treatment Performed - Jet Perforation
1993-09-02 Perforation Treatment Performed - Cement Squeeze
1993-09-05 Perforation Treatment Performed - Jet Perforation
1993-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-24 Plug Back Performed
1993-11-24 Well Log Performed
1993-11-25 Perforation Treatment Performed - Jet Perforation
1993-11-25 Well Log Performed
1993-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-02 Perforation Treatment Performed - Fractured
1993-12-23 Well Began Production
1993-12-23 Well Fluid changed to Crude Oil
1993-12-23 Well Mode changed to Flowing
1994-08-16 Well Fluid changed to Crude Oil
1994-08-16 Well Mode changed to Pumping
1996-02-06 Well Fluid changed to Crude Oil
1996-02-06 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-08-28 Perforation 2315.00 2318.00 13
1993-11-26 Acid Treatment 2268.00 2278.50 0
1993-11-27 Acid Treatment 2268.00 2278.50 0
1993-12-02 Fracture 2268.00 2278.50 0
1993-08-31 Acid Treatment 2315.00 2318.00 0
1993-09-01 Perforation 2323.00 2324.50 20
1993-09-02 Cement Squeeze 2315.00 2324.50 0
1993-09-05 Perforation 2315.00 2318.00 13
1993-09-06 Acid Treatment 2315.00 2318.00 0
1993-09-08 Acid Treatment 2315.00 2318.00 0
1993-11-24 Packing Device Capped w/Cement 2306.00 2314.00 0
1993-11-25 Perforation 2268.00 2278.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 142 0.0 0.0 0.0
1994 6262 0.0 0.0 0.0
1995 4525 0.0 0.0 0.0

For data sources see[5]

References