X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385033216003

Well Details

Well ID: 0385033216003
Loading map...
Location: 00/16-32-038-03W5/3
Location Alias: 00/16-32-38-03 W5M
Location Alias 2: 00/16-32-038-03 W5/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 32
County/Municipality: Lacombe County
Well Name: NAL MEDICINE RIVER 16-32-38-3
Operator Name: NAL Resources Limited
License Number: 0008075
License Date: 1954-06-02
License Status: Issued
Spud Date: 1954-06-29
Final Drill Date: 1954-09-26
Well Total Depth: 2737.10 m
Surface Hole Latitude: 52.317391
Surface Hole Longitude: -114.385520

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-02 Obtained License
1954-08-01 Drill Stem Test Performed
1954-09-13 Drill Stem Test Performed
1954-09-16 Drill Stem Test Performed
1954-09-22 Drill Stem Test Performed
1954-09-23 Drill Stem Test Performed
1954-09-26 Drill Stem Test Performed
1954-09-26 Finished Drilling
1954-09-26 Production Casing Operation Performed
1954-09-26 Well Mode changed to Drilled and Cased
1954-10-01 Perforation Treatment Performed - Jet Perforation
1954-10-02 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-07 Perforation Treatment Performed - Cement Squeeze
1955-08-09 Perforation Treatment Performed - Jet Perforation
1955-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-10 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-15 Perforation Treatment Performed - Jet Perforation
1955-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-08-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1955-08-21 Perforation Treatment Performed - Jet Perforation
1987-11-25 Well Log Performed
1989-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-27 Plug Back Performed
1996-09-27 Well Log Performed
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-29 Well Log Performed
1996-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-02 Well Log Performed
1996-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-03 Plug Back Performed
1996-10-03 Well Log Performed
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-04 Well Log Performed
1996-11-18 Perforation Treatment Performed - Jet Perforation
1996-11-18 Well Log Performed
1996-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-13 Well Log Performed
1997-12-03 Perforation Treatment Performed - Cement Squeeze
1997-12-07 Well Log Performed
1998-08-28 Perforation Treatment Performed - Fractured
1998-09-01 Well Began Production
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Flowing
2000-10-18 Well Fluid changed to Crude Oil
2000-10-18 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-01 Perforation 2645.00 2647.20 13
1955-08-15 Perforation 2642.00 2643.80 13
1955-08-17 Acid Treatment 2642.00 2643.80 0
1955-08-18 Packing Device Capped w/Cement 2234.20 2234.20 0
1955-08-19 Hydra Jet Perforation 2214.40 2214.40 0
1955-08-21 Perforation 2211.90 2213.80 13
1989-02-25 Acid Treatment 2211.90 2214.40 0
1996-09-27 Packing Device Capped w/Cement 2197.50 2205.50 0
1996-09-29 Perforation 2185.00 2188.00 18
1996-09-30 Acid Treatment 2185.00 2188.00 0
1996-10-03 Packing Device Capped w/Cement 2175.00 2183.00 0
1954-10-02 Acid Wash 2645.00 2647.20 0
1996-10-04 Perforation 2165.00 2170.80 16
1996-11-18 Perforation 2123.20 2125.10 16
1996-11-18 Perforation 2126.30 2127.50 16
1996-11-19 Acid Treatment 2123.20 2127.50 0
1997-12-03 Cement Squeeze 2123.20 2127.50 0
1998-08-28 Fracture 2165.00 2170.80 0
1955-08-07 Cement Squeeze 2645.40 2647.20 0
1955-08-09 Perforation 2642.00 2643.20 13
1955-08-10 Acid Wash 2642.00 2643.20 0
1955-08-10 Acid Treatment 2642.00 2643.20 0
1955-08-11 Acid Wash 2642.00 2643.20 0
1955-08-11 Acid Treatment 2642.00 2643.20 0
1955-08-13 Acid Treatment 2642.00 2643.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1966 0.0 0.0 0.0
1999 2947 0.0 0.0 0.0
2000 1141 0.0 0.0 0.0
2001 7289 0.0 0.0 0.0
2002 8301 0.0 0.0 0.0
2003 8422 0.0 0.0 0.0
2004 8664 0.0 0.0 0.0
2005 8291 0.0 0.0 0.0
2006 912 0.0 0.0 0.0
2007 1464 0.0 0.0 0.0
2008 8332 0.0 0.0 0.0
2009 8714 0.0 0.0 0.0
2010 8747 0.0 0.0 0.0
2011 8723 0.0 0.0 0.0
2012 7303 0.0 0.0 0.0
2013 7973 0.0 0.0 0.0
2014 8588 0.0 0.0 0.0
2015 7471 0.0 0.0 0.0
2016 7933 0.0 0.0 0.0
2017 7750 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 7888 0.0 0.0 0.0
2020 2141 0.0 0.0 0.0

For data sources see[5]

References