X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385033216000

Well Details

Well ID: 0385033216000
Loading map...
Location: 00/16-32-038-03W5/0
Location Alias: 00/16-32-38-03 W5M
Location Alias 2: 00/16-32-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 32
County/Municipality: Lacombe County
Well Name: NAL MEDICINE RIVER 16-32-38-3
Operator Name: NAL Resources Limited
License Number: 0008075
License Date: 1954-06-02
License Status: Issued
Spud Date: 1954-06-29
Final Drill Date: 1954-09-26
Well Total Depth: 2737.10 m
Surface Hole Latitude: 52.317391
Surface Hole Longitude: -114.385520

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-02 Obtained License
1954-08-01 Drill Stem Test Performed
1954-09-13 Drill Stem Test Performed
1954-09-16 Drill Stem Test Performed
1954-09-22 Drill Stem Test Performed
1954-09-23 Drill Stem Test Performed
1954-09-26 Drill Stem Test Performed
1954-09-26 Finished Drilling
1954-09-26 Production Casing Operation Performed
1954-09-26 Well Mode changed to Drilled and Cased
1954-10-01 Perforation Treatment Performed - Jet Perforation
1954-10-02 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-29 Well Began Production
1954-10-29 Well Fluid changed to Crude Oil
1954-10-29 Well Mode changed to Flowing
1955-08-07 Perforation Treatment Performed - Cement Squeeze
1955-08-07 Well Fluid changed to Crude Oil
1955-08-07 Well Mode changed to Abandoned Zone
1955-08-09 Perforation Treatment Performed - Jet Perforation
1955-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-10 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-15 Perforation Treatment Performed - Jet Perforation
1955-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-08-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1955-08-21 Perforation Treatment Performed - Jet Perforation
1987-11-25 Well Log Performed
1989-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-27 Plug Back Performed
1996-09-27 Well Log Performed
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-29 Well Log Performed
1996-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-02 Well Log Performed
1996-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-03 Plug Back Performed
1996-10-03 Well Log Performed
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-04 Well Log Performed
1996-11-18 Perforation Treatment Performed - Jet Perforation
1996-11-18 Well Log Performed
1996-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-13 Well Log Performed
1997-12-03 Perforation Treatment Performed - Cement Squeeze
1997-12-07 Well Log Performed
1998-08-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-01 Perforation 2645.00 2647.20 13
1955-08-15 Perforation 2642.00 2643.80 13
1955-08-17 Acid Treatment 2642.00 2643.80 0
1955-08-18 Packing Device Capped w/Cement 2234.20 2234.20 0
1955-08-19 Hydra Jet Perforation 2214.40 2214.40 0
1955-08-21 Perforation 2211.90 2213.80 13
1989-02-25 Acid Treatment 2211.90 2214.40 0
1996-09-27 Packing Device Capped w/Cement 2197.50 2205.50 0
1996-09-29 Perforation 2185.00 2188.00 18
1996-09-30 Acid Treatment 2185.00 2188.00 0
1996-10-03 Packing Device Capped w/Cement 2175.00 2183.00 0
1954-10-02 Acid Wash 2645.00 2647.20 0
1996-10-04 Perforation 2165.00 2170.80 16
1996-11-18 Perforation 2123.20 2125.10 16
1996-11-18 Perforation 2126.30 2127.50 16
1996-11-19 Acid Treatment 2123.20 2127.50 0
1997-12-03 Cement Squeeze 2123.20 2127.50 0
1998-08-28 Fracture 2165.00 2170.80 0
1955-08-07 Cement Squeeze 2645.40 2647.20 0
1955-08-09 Perforation 2642.00 2643.20 13
1955-08-10 Acid Wash 2642.00 2643.20 0
1955-08-10 Acid Treatment 2642.00 2643.20 0
1955-08-11 Acid Wash 2642.00 2643.20 0
1955-08-11 Acid Treatment 2642.00 2643.20 0
1955-08-13 Acid Treatment 2642.00 2643.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References