X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032606000

Well Details

Well ID: 0385032606000
Loading map...
Location: 00/06-26-038-03W5/0
Location Alias: 00/06-26-38-03 W5M
Location Alias 2: 00/06-26-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 26
County/Municipality: Lacombe County
Well Name: NAL SYLAKE 6-26-38-3
Operator Name: NAL Resources Limited
License Number: 0075614
License Date: 1979-05-10
License Status: Abandoned
Spud Date: 1979-05-20
Final Drill Date: 1979-06-01
Well Total Depth: 2222.00 m
Surface Hole Latitude: 52.294146
Surface Hole Longitude: -114.328032

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-10 Obtained License
1979-06-01 Finished Drilling
1979-06-01 Well Mode changed to Drilled and Cased
1979-06-03 Drill Stem Test Performed
1979-06-04 Drill Stem Test Performed
1979-06-06 Production Casing Operation Performed
1979-06-16 Perforation Treatment Performed - Jet Perforation
1979-06-18 Well Began Production
1979-06-18 Well Fluid changed to Crude Oil
1979-06-18 Well Mode changed to Flowing
1987-04-01 Well Fluid changed to Crude Oil
1987-04-01 Well Mode changed to Suspended
2003-05-06 Well Log Performed
2003-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-04 Perforation Treatment Performed - Jet Perforation
2003-06-04 Plug Back Performed
2003-06-04 Well Fluid changed to Crude Oil
2003-06-04 Well Mode changed to Abandoned Zone
2003-06-05 Perforation Treatment Performed - Remedial Casing
2003-06-06 Perforation Treatment Performed - Jet Perforation
2003-06-06 Perforation Treatment Performed - Remedial Casing
2003-06-16 Well Abandoned
2003-06-16 Well Fluid changed to Crude Oil
2003-06-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-16 Perforation 1925.70 1927.20 10
2003-06-04 Packing Device Capped w/Cement 1907.00 1915.00 0
2003-06-04 Perforation 980.00 981.00 14
2003-06-05 Remedial Casing Cementing 980.00 981.00 0
2003-06-06 Perforation 381.00 382.00 14
2003-06-06 Remedial Casing Cementing 381.00 382.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1154 0.0 0.0 0.0
1980 2235 0.0 0.0 0.0
1981 456 0.0 0.0 0.0
1982 933 0.0 0.0 0.0
1983 1476 0.0 0.0 0.0
1984 6867 0.0 0.0 0.0
1985 8064 0.0 0.0 0.0
1986 96 0.0 0.0 0.0

For data sources see[5]

References