X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032216000

Well Details

Well ID: 0385032216000
Loading map...
Location: 00/16-22-038-03W5/0
Location Alias: 00/16-22-38-03 W5M
Location Alias 2: 00/16-22-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 22
County/Municipality: Lacombe County
Well Name: EXORO ENERGY SYLAKE 16-22-38-3
Operator Name: Vesta Energy Ltd.
License Number: 0104775
License Date: 1983-12-19
License Status: Suspension
Spud Date: 1984-01-04
Final Drill Date: 1984-01-19
Well Total Depth: 2218.00 m
Surface Hole Latitude: 52.288572
Surface Hole Longitude: -114.337989

For data sources see[1][2]

Well History

Date Event
1983-12-19 Obtained License
1984-01-19 Finished Drilling
1984-01-19 Well Log Performed
1984-01-19 Well Mode changed to Drilled and Cased
1984-01-20 Well Log Performed
1984-01-23 Production Casing Operation Performed
1984-02-10 Perforation Treatment Performed - Jet Perforation
1984-02-10 Well Log Performed
1984-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-14 Perforation Treatment Performed - Fractured
1984-02-16 Perforation Treatment Performed - Cement Squeeze
1984-02-18 Perforation Treatment Performed - Jet Perforation
1984-02-18 Well Log Performed
1984-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-23 Perforation Treatment Performed - Fractured
1984-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-05 Plug Back Performed
1984-09-06 Perforation Treatment Performed - Jet Perforation
1984-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-07 Perforation Treatment Performed - Jet Perforation
1984-09-07 Plug Back Performed
1984-09-08 Perforation Treatment Performed - Jet Perforation
1984-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-17 Plug Back Performed
1984-09-18 Perforation Treatment Performed - Jet Perforation
1984-09-18 Well Log Performed
1984-09-20 Perforation Treatment Performed - Fractured
1984-09-29 Well Began Production
1984-09-29 Well Fluid changed to Crude Oil
1984-09-29 Well Mode changed to Flowing
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-10 Perforation 2181.00 2184.50 13
1984-09-07 Packing Device Capped w/Cement 2120.00 2129.00 0
1984-09-07 Perforation 2100.00 2100.50 7
1984-09-07 Perforation 2098.50 2099.50 7
1984-09-08 Perforation 2094.50 2095.50 7
1984-09-17 Packing Device Capped w/Cement 2067.00 2075.00 0
1984-09-18 Perforation 1920.00 1921.00 7
1984-09-18 Perforation 1917.00 1917.50 7
1984-09-18 Perforation 1922.50 1923.50 7
1984-09-18 Perforation 1928.00 1929.00 7
1984-09-18 Perforation 1926.50 1927.50 7
1984-02-11 Acid Treatment 2181.00 2184.50 0
1984-09-20 Fracture 1917.00 1929.00 0
1984-02-14 Fracture 2181.00 2184.50 0
1984-02-16 Cement Squeeze 2181.00 2184.50 0
1984-02-18 Perforation 2173.50 2175.50 13
1984-02-19 Acid Treatment 2173.50 2175.50 0
1984-02-23 Fracture 2173.50 2175.50 0
1984-09-05 Packing Device Capped w/Cement 2157.00 2165.00 0
1984-09-06 Perforation 2132.00 2133.00 8

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2008 0.0 0.0 0.0
1985 8303 0.0 0.0 0.0
1986 2541 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References